Starting from:

$20

AGCO NA SH16A-SH17A-SH19A Backhoe Repair Time Schedule Manual – PDF DOWNLOAD

AGCO NA SH16A-SH17A-SH19A Backhoe Repair Time Schedule Manual – PDF DOWNLOAD

FILE DETAILS:

AGCO NA SH16A-SH17A-SH19A Backhoe Repair Time Schedule Manual – PDF DOWNLOAD

Language : English
Pages :15
Downloadable : Yes
File Type : PDF
Size:5.79 MB

DESCRIPTION:

AGCO NA SH16A-SH17A-SH19A Backhoe Repair Time Schedule Manual – PDF DOWNLOAD

A. TIME ALLOWANCE

  • The times listed in this publication are the result of careful study of the operation concerned; they represent the average time ONE trained Dealer mechanic, of normal ability has taken to carry out the operation in a typical Dealership, using standard workshop tooling and equipment including air tools, located for reasonable access and working conditions.
  • They DO NOT include any traveling to or from the farm or site. The machine is assumed to be clean and to be bare of any extra equipment or attachment of non “AGCO” manufacture, and delivered to an authorized and duly equipped workshop where trained personnel and spare parts required to perform the operations are immediately available.
  • The times given include difficulties encountered working on used as opposed to new machines, and are based on methods and recommended tools shown in the workshop manual. The times are based on a second hand machine in reasonable condition properly maintained using approved parts.
  • Extra time may be required to deal with seized, rusted or damaged parts. Allowances are included in the operation times quoted for obtaining all tools and parts, cleaning and testing after repair. Diagnostic time is included in the time allowance unless a separate code is listed for diagonistic time.
  • The times given in this Repair Time Schedule are for a complete job from start to finish, including allowances for intermediate operations.

B.TIMES

All the operating times are presented in hours and the decimal parts of an hour. Decimal times must be used on all warranty claims. The times given in this repair time schedule are for a complete job from start to finish. Where access has been gained for an adjacent repair only the additional time for the second repair will be accepted and not the total time for the two failures.

C.REVIEW Of TIMES 

INTRODUCTION If you find any improvement in the method which reduces the time of an operation or you find you cannot meet an operation time after more than three attempts using the recommended method, a “Request for Review of Time” form (see next page) must be submitted quoting all relevant details. Photo copy the form and fax it to the following address:

TABLE OF CONTENTS:

AGCO NA SH16A-SH17A-SH19A Backhoe Repair Time Schedule Manual – PDF DOWNLOAD

ACCESSORIES
BUCKETS 14
STABILIZER PADS 15
BASE MACHINE
3-POINT MOUNT 8
HYDRAULIC CYLINDERS & HOSES 6
MAIN FRAME 5
SUBFRAME MOUNTING KIT 7
HYDRAULICS
CYLINDER ASSY BOOM 11
CYLINDER ASSY BUCKET, DIPPER & STABILIZER 10
CYLINDER ASSY SWING 9
HYDRAULIC KIT 12
VALVEASSY 13

IMAGES PREVIEW OF THE MANUAL:

 

More products