Starting from:

$36

AGCO®NA 7423 7424 7433 7434 7444 Large Rectangular Baler Repair Time Schedule Manual 790332008 – PDF

AGCO®NA 7423 7424 7433 7434 7444 Large Rectangular Baler Repair Time Schedule Manual 790332008 – PDF DOWNLOAD

FILE DETAILS:

AGCO®NA 7423 7424 7433 7434 7444 Large Rectangular Baler Repair Time Schedule Manual 790332008 – PDF DOWNLOAD

Language : English
Pages :222
Downloadable : Yes
File Type : PDF
Size:58.2 MB

DESCRIPTION:

AGCO®NA 7423 7424 7433 7434 7444 Large Rectangular Baler Repair Time Schedule Manual 790332008 – PDF DOWNLOAD

INTRODUCTION

A. TIME ALLOWANCE

  • The times listed in this publication are the result of careful study of the operation concerned; they represent the average time ONE trained dealer mechanic, of normal ability has taken to carry out the operation in a typical dealership, using standard workshop tooling and equipment including air tools, located for reasonable access and working conditions.
  • They DO NOT include any traveling to or from the farm or site. The machine is assumed to be clean and to be bare of any extra equipment or attachment of non “AGCO” manufacture, and delivered to an authorized and duly equipped workshop where trained personnel and spare parts required to perform the operations are immediately available.
  • The times given include difficulties encountered working on used as opposed to new machines, and are based on methods and recommended tools shown in the workshop manual. The times are based on a second hand machine in reasonable condition properly maintained using approved parts.
  • Extra time may be required to deal with seized, rusted or damaged parts. Allowances are included in the operation times quoted for obtaining all tools and parts, cleaning and testing after repair. Diagnostic time is included in the time allowance unless a separate code is listed for diagonistic time. The times given in this Repair Time Schedule are for a complete job from start to finish, including allowances for intermediate operations.

B.TIMES

All the operating times are presented in hours and the decimal parts of an hour. Decimal times must be used on all warranty claims. The times given in this repair time schedule are for a complete job from start to finish. Where access has been gained for an adjacent repair only the additional time for the second repair will be accepted and not the total time for the two failures.

C.REVIEW OF TIMES 

If you find any improvement in the method which reduces the time of an operation or you find you cannot meet an operation time after more than three attempts using the recommended method, a “Request for Review of Time” form (see next page) must be submitted quoting all relevant details. Photo copy the form and fax it to the following address:

TABLE OF CONTENTS:

AGCO®NA 7423 7424 7433 7434 7444 Large Rectangular Baler Repair Time Schedule Manual 790332008 – PDF DOWNLOAD

Section
Contents
Description
Drives
Pickup
Electrical
Charge and Plunger
Knotter and Lube
Frame, Wheels and Shields
Hydraulics
Decal and Kits
Accumulator
ACCUMULATOR
ACCUMULATOR LUBE KIT (700710808 ACCUMULATOR LUBE KIT) 221
BALE SHIFT BAR AND LINKAGE 212
BALE WEIGHT KIT (BK41118 BALE WEIGHT KIT) 219
BALE WEIGHT KIT (W/ BC ELEC) (Continued) 220
CART ASSEMBLY (UNLATCHING) 211
CART-LEFT 213
CART-RIGHT 214
DECALS-ACCUMULATOR 217
ELECTRICAL (SWITCH AND SOLENOID) 210
ELECTRICAL CONTROL BOX ASSEMBLY (6811137 CONTROL BOX ASSEMBLY) 209
FRAME AND PANEL (REAR) 215
HITCH AND BALE SUPPORT 206
HYDRAULIC AND ELECTRICAL MOUNTING 207
HYDRAULIC CYLINDER ASSEMBLY (7896079 HYDRAULIC CYLINDER ASSEMBLY) 208
LUBE ASM (CENTRALIZED FOR ACCUMULATOR) 216
MAINFRAME 204
MAINFRAME AND CASTER MOUNTING 203
ROAD LIGHT MOUNTING 218
WHEEL ASSEMBLY (CASTER) 205
CHARGE AND PLUNGER
BRAKE ASSEMBLY 86
DOG CLUTCH ASSEMBLY 85
EJECTOR MOUNTING (SN HS74101 THRU HT74461) 96
EJECTOR MOUNTING (SN HT74462 AND LATER) 97
FEEDER CHUTE (SN HS74101 THRU HT74262) 87
FEEDER CHUTE (SN HT74263 AND LATER) 88
HOLDING FINGER (STUFFER CHAMBER) 92
PACKER AND AUGER MOUNTING (SN HT74101 AND LATER) 78
PACKER AND AUGER MOUNTING (SN HS74101 THRU HT74100) 77
PACKER AND AUGER MOUNTING (SN HS74101 THRU HT74100) (Continued) 79
PACKER AND AUGER MOUNTING (SN HT74101 AND LATER) (Continued) 80
PACKER CRANK 82
PACKER CRANK MOUNTING 81
PACKER STRUTS AND WRAPPERS (SN HS74101 THRU HT74262) 89
PACKER STRUTS AND WRAPPERS (SN HT74263 AND LATER) 90
PLUNGER ASSEMBLY 94
PLUNGER STRIPPER MOUNTING 95
ROD ARM MOUNTING 93
STUFFER CLUTCH LINKAGE 91
STUFFER DRIVE (LEFT) 83
STUFFER DRIVE (RIGHT) 84
DECAL AND KITS
ACCUMULATOR MOUNTING KIT (MK41207 ACCUMULATOR MOUNTING KIT) 193
BALE CHUTE KIT (MK41208 BALE CHUTE KIT) 189
BALE CHUTE-ROLLER KIT (Continued) 191
BALE CHUTE-ROLLER KIT (MK41281 BALE CHUTE-ROLLER KIT) 190
BLOWER 202
DECALS-LOGO 184
DECALS-OPERATIONAL (CE) 187
DECALS-OPERATIONAL (CE) (Continued) 188
DECALS-OPERATIONAL (NON CE) 185
DECALS-OPERATIONAL (NON CE) (Continued) 186
DRIVELINE KIT, PRIMARY (NON CE) (MK41212 DRIVELINE KIT) (1-3/8 INCH X 21 SPLINE TRACTOR)
196
DRIVELINE KIT, PRIMARY (NON CE) (MK41213 DRIVELINE KIT) (1-3/4 INCH X 20 SPLINE TRACTOR)
197
GTA I CONSOLE KIT (NON CE) (MK51261 GTA I CONSOLE KIT) 198
GTA II CONSOLE KIT (NON CE) (MK41262 GTA II CONSOLE KIT) 199
GTA II CONSOLE KIT (NON CE) (MK41264 GTA II CONSOLE KIT W/O MONITOR) 200
HYDRAULIC BLOWER KIT (MK41278 KNOTTER BLOW KIT) 201
SHEAR BOLT KITS 195
VALVE ASSEMBLY (ACCUMULATOR MOUNTING) (700727447 VALVE ASSEMBLY) 194
LARGE RECTANGULAR BALER/ ACCUMULATOR
DRIVES
CUTTER DRIVE 25
CUTTER GEARBOX ASSEMBLY 26
CUTTER SLIP CLUTCH ASSEMBLY (700140066 CLUTCH ASSEMBLY-SLIP) 27
DRIVE SHAFT 11
DRIVE-AUXILIARY (LEFT) (SN HS74101 THAU HT74262) 20
DRIVE-AUXILIARY (LEFT) (SN HT74263 AND LATER) 21
DRIVE-RIGHT (AUXILIARY) 22
DRIVELINE ASSEMBLY, PRIMARY (1-3/4 INCH X 20 SPLINE TRACTOR) (NON CE) 14
DRIVELINE ASSEMBLY, PRIMARY (1-3/8 INCH X 21 SPLINE TRACTOR) (NON CE) 13
DRIVELINE ASSEMBLY, PRIMARY (CE) (1-3/4 INCH X 20 SPLINE TRACTOR) 16
DRIVELINE ASSEMBLY, PRIMARY (CE) (1-3/8 INCH X 21 SPLINE TRACTOR) 15
DRIVELINE ASSEMBLY, SECONDARY 12
FLYWHEEL BRAKE 17
FLYWHEEL CLUTCH ASSEMBLY 10
GEARBOX ASSEMBLY (700723443 GEARBOX ASSEMBLY) 19
GEARBOX MOUNTING AND FLYWHEEL 18
HITCH AND JACK MOUNTING 7
HITCH AND MOUNTING (CE) 8
MAIN DRIVE 9
SHAFT AND SPROCKET (AUXILIARY) 23
SLIP CLUTCH (AUXILIARY) 24
ELECTRICAL
CUTTER WIRING 67
ELECTRICAL KIT (BOX OF SERVICE PARTS) (700154471 BOX OF SERVICE PARTS) 66
ELECTRICAL-LIGHTS (CE) 72
ELECTRICAL-LIGHTS (CE) (Continued) 73
ELECTRICAL-LIGHTS (NON CE) 68
ELECTRICAL-LIGHTS (NON CE) (Continued) 69
ELECTRICAL-LIGHTS (NON CE) (Continued) (SN HS74101 THAU HT74115) 70
ELECTRICAL-LIGHTS (NON CE) (Continued) (SN HT74116 AND LATER) 71
GTA I CONSOLE AND MOUNTING (CE) 60
GTA I CONSOLE AND MOUNTING (NON CE) 58
GTA II CONSOLE AND MOUNTING (CE) 61
GTA II CONSOLE AND MOUNTING (NON CE) 59
GTA MOUNTING (OPTIONAL PARTS) 62
UPPER WIRING 64
WIRING-CONTROL BOX 63
WIRING-LOWER CONTROL 65
FRAME WHEELS AND SHIELDS
ACTUATOR ASSEMBLY-PARK BRAKE (700721855 ACTUATOR ASSEMBLY) 166
AIR BRAKES-SINGLE AXLE 167
AIR BRAKES-TANDEM AXLE 168
AXLE ASSEMBLY (TANDEM) 156
AXLE MOUNTING-SINGLE AXLE 151
AXLE-RIGID WITHOUT BRAKES (TANDEM) 160
BALE DENSITY DOORS AND ARMS 123
BRAKE ASSEMBLY-LEFT (SINGLE AXLE) (700144079 BRAKE AND SPINDLE ASSEMBLY) 154
BRAKE ASSEMBLY-RIGHT (SINGLE AXLE) (700144078 BRAKE AND SPINDLE ASSEMBLY) 155
BRAKE MOUNTING-SINGLE AXLE 153
BRAKES AND RIGID AXLE (TANDEM) (LEFT SIDE SHOWN, RIGHT SIDE OPPOSITE) 157
DOOR-LEFT 137
DOOR-RIGHT 138
DUST COVER-BRAKES (700730760 DUST COVER KIT) 159
HANDRAIL MOUNTING 149
HUB AND SPINDLE-SINGLE AXLE (WITHOUT BRAKES) 152
HUB ASSEMBLY (TANDEM) (LEFT SIDE SHOWN, RIGHT SIDE OPPOSITE) 161
KNOTTER SHIELD LATCHES (CE) 129
KNOTTER SHIELD LATCHES (NON CE) 128
KNOTTER SHIELD-WITHOUT BLOWER 130
KNOTTER SHIELDS 125
4
INDEX
5
INDEX
LARGE RECTANGULAR BALER/ACCUMULATOR
FRAME WHEELS AND SHIELDS (CONTINUED)
KNOTTER SHIELDS (SN HS74101 THRU HS74130) 126
KNOTTER SHIELDS (SN HS74131 AND LATER) 127
LOWER SHIELDS-SINGLE AXLE 147
LOWER SHIELDS-TANDEM AXLE 148
PARK BRAKE-SINGLE AXLE 164
PARK BRAKE-TANDEM AXLE 165
PLUNGER RAILS, KNIVES AND HAY DOG 122
SHIELD ASSEMBLY-FRONT, LEFT (700143291 SHIELD ASSEMBLY-FRONT, LEFT) 139
SHIELD ASSEMBLY-FRONT, RIGHT (700143292 SHIELD ASSEMBLY-FRONT, RIGHT) 140
SHIELD SUPPORT-LEFT 135
SHIELD SUPPORT-RIGHT 136
SHIELDS-FRONT 124
SHIELDS-LOWER, SINGLE, CUTTER 141
SHIELDS-LOWER, SINGLE, NO CUTTER (SN HS74101 THRU HT74100) 142
SHIELDS-LOWER, SINGLE, NO CUTTER (SN HT74101 AND LATER) 143
SHIELDS-LOWER, TANDEM, CUTTER 144
SHIELDS-LOWER, TANDEM, NO CUTTER (SN HS74101 THRU HT74100) 145
SHIELDS-LOWER, TANDEM, NO CUTTER (SN HT74101 AND LATER) 146
STEERING AXLE (TANDEM) 162
STEERING AXLE BRAKES (TANDEM) (LEFT SIDE SHOWN, RIGHT SIDE OPPOSITE) 158
TOOL BOX ASSEMBLY 150
TWINEBOX AND LADDER MOUNTING-LEFT 131
TWINEBOX MOUNTING-RIGHT 132
TWINEBOX-LEFT 133
TWINEBOX-RIGHT 134
WHEELS 163
HYDRAULICS
BALE EJECTOR HYDRAULIC 182
BLOWER 179
BLOWER HYDRAULICS 178
HYDRAULIC AUTO BRAKE (CE) 183
HYDRAULIC BALE DENSITY 174
HYDRAULIC CYLINDER (PICKUP LIFT) (700726996 HYDRAULIC CYLINDER ASSEMBLY) 170
HYDRAULIC CYLINDER ASSEMBLY (700720351 HYDRAULIC CYLINDER ASSEMBLY) 181
HYDRAULIC RESERVOIR 173
HYDRAULIC VALVE ASSEMBLY (BALE DENSITY) (700723497 VALVE ASSEMBLY) 172
HYDRAULIC-FRONT 171
HYDRAULICS-BRAKE, SINGLE AXLE 175
HYDRAULICS-BRAKE, TANDEM AXLE (LEFT SIDE SHOWN, RIGHT SIDE OPPOSITE) 176
HYDRAULICS-CUTTER 180
PICKUP HYDRAULICS 169
STEERING LOCK-TANDEM AXLE 177
KNOTTER AND LUBE
KNOTTER 99
KNOTTER (BOX OF SERVICE PARTS) (700150670 BOX OF SERVICE PARTS) 121
KNOTTER ARM MOUNTING 113
KN OTTER BRAKE 105
KNOTTER CLUTCH 104
KNOTTER HEAD ASSEMBLY (700113321 KNOTTER HEAD ASSEMBLY) 102
KNOTTER HEAD ASSEMBLY-Continued 103
KNOTTER LUBE 118
KNOTTER LUBE PUMP MOUNTING 117
KNOTTER LUBE VALVE (PRIMARY) 119
KNOTTER LUBE VALVE (SECONDARY) 120
KNOTTER MONITOR 116
KNOTTER SLACKER-UPPER 100
KN OTTER TWINE FINGER AND HAY DOG 106
MAIN KNOTTER SHAFT ASSEMBLY (700141371 MAIN KNOTTER SHAFT ASSEMBLY) 101
NEEDLE MOUNTING 98
STARWHEEL 111
STARWHEEL LINKAGE

IMAGES PREVIEW OF THE MANUAL: