Starting from:

$30.95

Ammann ARX 12-2 ARX 16-2 ARX 20-2 Tandem Roller Operating Manual - PDF

Ammann ARX 12-2 ARX 16-2 ARX 20-2 Tandem Roller Kubota D1105-EF07 EU Stage V, U.S. EPA Tier 4f Operating Manual – PDF DOWNLOAD

FILE DETAILS:

Ammann ARX 12-2 ARX 16-2 ARX 20-2 Tandem Roller Kubota D1105-EF07 EU Stage V, U.S. EPA Tier 4f Operating Manual – PDF DOWNLOAD

Language : English
Pages : 198
Downloadable : Yes
File Type : PDF

ARX 12-2 KU St V / T4f Product Identification Number 3010613 –
ARX 16-2 KU St V / T4f Product Identification Number 3010862 –
ARX 20-2 KU St V / T4f Product Identification Number 3012263 –

IMAGES PREVIEW OF THE MANUAL:

  

TABLE OF CONTENTS:

Ammann ARX 12-2 ARX 16-2 ARX 20-2 Tandem Roller Kubota D1105-EF07 EU Stage V, U.S. EPA Tier 4f Operating Manual – PDF DOWNLOAD

Contents 10

1 SPECIFICATION MANUAL 15

1 1Basic data 16

1 2Dimensional drawing of the machine 18

1 3Technical data 20

2 OPERATING MANUAL 25

2 1Main safety precautions 27

2 1 1Safety precautions during operation of the machine 27

2 1 1 1Before compacting works are started 27

2 1 1 2Work in the dangerous area 27

2 1 1 3Ensurance of safety measures by the provider 28

2 1 1 4 Protective ROPS frame 28

2 1 2Requirements for the qualification of machine operators 29

2 1 3Driver’s obligations 30

2 1 4Forbidden activities – safety and guarantee 31

2 1 5Safety notices and signs applied on the machine 33

2 1 6Hand signals 37

2 2Environmental and hygiene principles 40

2 2 1Hygiene principles 40

2 2 2Environmental principles 40

2 3Preservation and storage 41

2 3 1Short-term preservation and storage for 1–2 months 41

2 3 2Preservation and storage of the machine for a period over 2 months 41

2 3 3Machine depreservation 43

2 4Machine disposal after its service life 45

2 5Machine description 46

2 6Controls and checking instruments 48

2 6 1Dashboard and control panels 49

2 7Machine operation and use 66

2 7 1Starting the engine 67

2 7 2Drive and reverse drive 71

2 7 3Stopping the machine and turning off the engine 79

2 7 4Machine emergency stop 79

2 7 5Machine parking 81

2 7 6Panic response 81

2 7 7Sprinkling 83

2 7 8Infrathermometer (optional equipment) 84

2 7 9ROPS lifting and lowering 90

2 7 9 1Lowering and raising of the ROPS frame with a plastic canopy 92

2 7 10Telematics readiness 98

2 7 11Edge cutter (optional equipment) 98

2 7 12Calibration mode 100

2 7 13Lowering and raising of the plastic canopy 103

2 8Machine transport 105

2 8 1Loading the machine 106

2 8 1 1Loading the machine using a ramp 106

2 8 1 2Loading the machine using a crane 107

2 9Special conditions to use the machine 108

2 9 1Machine operation during initial run period 108

2 9 2Machine operation at low temperatures 108

2 9 3Machine operation at higher temperatures and humidity 108

2 9 4Machine operation at higher altitudes 108

2 9 5Machine operation in dusty environment 109

2 9 6Driving with vibration on compacted and hard materials 109

3 MAINTENANCE MANUAL 111

3 1Safety and other measures during maintenance of the machine 113

3 1 1Safety during machine maintenance 113

3 1 2Fire protection when operating fluids are changed 113

3 1 3Environmental and hygiene principles 114

3 2Specification of operating fluids 115

3 2 1Engine oil 115

3 2 2Fuel 116

3 2 3Coolant 117

3 2 4Hydraulic oil 118

3 2 5Lubricating grease 118

3 2 6Emulsion 118

3 6 7Vibrator lubricating grease 118

3 3Fluids 119

3 4Lubrication and maintenance chart 120

3 5Lubrication and service plan 123

3 6Lubrication and maintenance operations 124

Every 20 hours of operation (daily) 125

3 6 1Fuel check 125

3 6 2Engine oil check 126

3 6 3Engine coolant check 127

3 6 4Checking the oil in the hydraulic tank 128

3 6 5Cleaning the hydraulic oil cooler 129

3 6 6Air filter check 130

3 6 7Sprinkling emulsion level check 131

3 6 8Sprinkling tank refilling 132

3 6 9Scraper adjustment 132

3 6 10Inspection of warning and checking devices 133

3 6 11Engine leakage check 135

3 6 12Check of the fan and engine belt for condition 135

3 6 13Brake test 136

3 6 13 1Check of the parking brake 136

3 6 13 2Check of the emergency brake 137

3 6 13 3Check of the service brake 138

3 6 14Check of the tightness of the fuel and hydraulic system 139

Every 50 hours of operation 140

3 6 15Check of hoses and clips 140

3 6 16Battery inspection 141

Every 100 hours of operation 142

3 6 17Air filter cleaning 142

3 6 18Cleaning the water separator on the fuel filter 143

3 6 19Machine lubrication 144

3 6 20Tyre pressure check 145

Every 200 hours of operation 146

3 6 21Fuel filter replacement 146

3 6 22Engine oil change 147

3 6 23Checking the hoses of the engine cooler for wear and mounting 149

3 6 24Checking the hoses and clips for mounting 149

3 6 25Sprinkling filter cleaning 150

3 6 26Engine intake pipe inspection 151

Every 500 hours of operation, but at least once a year 152

3 6 27Fuel tank cleaning 152

3 6 28Electrical installation inspection 153

3 6 29Replacement of the fuel separator filter cartridge 153

3 6 30Valve clearance check and adjustment 154

3 6 31Engine cooler cleaning 154

3 6 32Check of rubber-metal elements of the engine cooler 155

Every 1000 hours of operation 156

3 6 33Hydraulic oil change and filter replacement 156

3 6 34Replacement of air filter cartridges 159

3 6 35Damping system check 161

3 6 36Swinging support check 162

3 6 37Articulation joint check 162

Every 1500 hours of operation 163

3 6 38Changing the vibrator lubricant 163

3 6 39Checking the condition of vibrator bearings 163

Every 2000 hours of operation 164

3 6 40Engine belt replacement 164

3 6 41Engine coolant change 164

3 6 42Replacement of hoses of the cooling system 166

3 6 43Replacement of rubber-metal elements of the engine cooler 166

3 6 44Replacement of hoses of the fuel system 166

3 6 45Replacement of suction hoses 166

Maintenance as required 167

3 6 46Gas strut replacement 167

3 6 47Cleaning the water separator 168

3 6 48Cleaning the water tank 168

3 6 49Cleaning the machine 169

3 6 50Draining water from the sprinkling circuit before the winter season 170

3 6 51Fuel system venting 171

3 6 52Charging of the battery 172

3 6 53Checking the screw connections for tightening 173

3 7Troubleshooting 175

3 7 1List of error codes displayed on the display 176

3 8Appendices 184

Wiring diagram 184

Hydraulic diagram ARX 12-2 / ARX 16-2 / ARX 20-2 190

Hydraulic diagram ARX 16-2C 192

Table of spare parts for regular maintenance 194

Content of the filter set after 200 hours (4-760259) 195

Content of the filter set after 500 hours (4-760260) 195

Content of the filter set after 1000 hours (4-760261) 195

More products