$38
FILE DETAILS:
Ditch Witch MX9 Operator’s Manual PN 054-110 – PDF DOWNLOAD
Language : English
Pages : 211
Downloadable : Yes
File Type : PDF
IMAGES PREVIEW OF THE MANUAL:
TABLE OF CONTENTS:
Ditch Witch MX9 Operator’s Manual PN 054-110 – PDF DOWNLOAD
Foreword 2
Your Machine Serial Numbers and Dealer 2
Safety Information 4
Signal Words 4
Example of Safety Message Using Signal Word 4
Other Signal Words 4
Safety Labels 5
Example of Safety Label Using Words 5
Example of Safety Label Using Pictogram 5
Introduction 6
Directions of Machine 7
Product Information 7
Machine Serial Number Plate and Its Location 7
Engine Serial Number Plate and Its Location 8
Emission Control Information Label and Its Location 8
Service Meter Location 9
Contents 9
Safety 10
Chapter Contents 10
Safety Labels 12
Location of Safety Labels 12
Safety Labels 13
Safety Information 15
Safety Rules 15
If Abnormalities Are Found 15
Working Wear and Personal Protective Items 15
Fire Extinguisher and First Aid Kit 16
Safety Equipment 16
Keep Machine Clean 16
Keep Operator’s Compartment Clean 17
Leaving Operator’s Seat with Lock 17
Handrails and Steps 18
Mounting and Dismounting 18
No Persons on Attachments 19
Burn Prevention 19
Fire Prevention and Explosion Prevention 20
Action If Fire Occurs 21
Falling Objects, Flying Objects and Intruding Objects Prevention 22
Attachment Installation 22
Attachment Combinations 22
Unauthorized Modifications 22
Safety at Jobsite 23
Working on Loose Ground 23
Distance to High Voltage Cables 24
Ensure Good Visibility 24
Ventilation for Enclosed Area 25
Signalperson’s Signal and Signs 25
Asbestos Dust Hazard Prevention 25
Safe Machine Operation 26
Starting Engine 26
Operation 27
Transportation 35
Battery 36
Towing 38
Lifting Objects with Bucket 39
Safe Maintenance Information 40
Warning Tag 40
Keep Work Place Clean and Tidy 40
Operation 48
Machine View Illustrations 50
Overall Machine View 50
Controls and Gauges 51
Detailed Controls and Gauges 52
Meters and Lamps 52
Switches 54
Control Levers and Pedals 57
Variable Blade 66
Engine Hood 67
Fuse 67
In-Line Fuse 68
Operator’s Manual Storage 69
Machine Operations and Controls 70
Before Starting Engine 70
Adjustment 76
Before Starting Engine 79
Starting Engine 81
After Starting Engine 84
Stopping the Engine 86
Check After Shutting Off Engine 87
Machine Operation 88
Backhoe Controls and Operations 96
Prohibited Operations 98
General Operation Information 101
Transportation 116
Transportation Procedure 116
Shipping Machine Information 120
Cold Weather Operation 121
Cold Weather Operation Information 121
After Daily Work Completion 123
After Cold Weather Season 123
Long-Term Storage 124
Before Storage 124
During Storage 124
After Storage 125
Starting Machine After Long-Term Storage 125
Troubles and Actions 126
Running Out of Fuel 126
Conditions That Are Not Failures 126
Towing the Machine 127
Severe Job Conditions 127
Discharged Battery 128
Battery Removal and Installation 129
Battery Charging 130
Starting Engine with Jumper Cables 130
Other Trouble 133
Maintenance 138
Maintenance Information 138
Lubricants, Coolant, and Filters 141
Handling Oil, Fuel, and Coolant 141
Electrical System Maintenance 143
Lubricants, Fuel, and Coolant Specifications 144
Proper Selection 144
Tightening Torque Specifications 148
Tightening Torque List 148
Maintenance Schedule 150
Maintenance Interval for Hydraulic Breaker 151
Maintenance Procedure 152
Initial 250 Hour Maintenance (Only After the First 250 Hours) 152
When Required 153
Checks Before Starting 167
Every 100 Hours Maintenance 168
Every 250 Hours Maintenance 169
Check Oil Level In Final Drive Case, Add Oil 170
Replace Hydraulic Filter Element 171
Check and Adjust Cooling Fan Belt Tension 172
Every 500 Hours Maintenance 173
Every 1000 Hours Maintenance 179
Every 2000 Hours Maintenance 180
Check Alternator and Starting Motor 181
Check and Adjust Engine Valve Clearance 181
Specifications 182
Attachments and Options 184
General Information 185
Safety First 185
Attachment Installation 187
Bucket with Hook 188
Hook Condition 188
Prohibited Operations 188
Attachment Guide 189
Attachment Combinations 189
Handling Arm with Built-In Breaker 191
Bucket Position 191
Removing and Installing Chisel 191
Procedure for Breaker Operations 193
Precautions When Carrying Out Breaker Operations 194
Stowing Chisel, Dummy Chisel 195
Precautions When Carrying Out Bucket Operations 195
Handling Dummy Link 196
Check Before Starting 197
Specifications 198
Handling Bucket Coupler 199
Procedure for Removing Bucket 199
Procedure for Installing Bucket 201
Recommended Attachment Operations 203
Hydraulic Breaker 203
Support 208
Procedure 208
Resources 208
Publications 208
Ditch Witch Training 208
Warranty 209