Starting from:

$36

Gehl Compact Excavator Z27, 270Z, Z35, 350Z Service Manual 50940109 – PDF DOWNLOAD

Gehl Compact Excavator Z27, 270Z, Z35, 350Z Service Manual 50940109 – PDF DOWNLOAD

FILE DETAILS:

Gehl Compact Excavator Z27, 270Z, Z35, 350Z Service Manual 50940109 – PDF DOWNLOAD

Language : English
Pages : 644
Downloadable : Yes
File Type : PDF
Size: 63 MB

IMAGES PREVIEW OF THE MANUAL:

  

DESCRIPTION:

Gehl Compact Excavator Z27, 270Z, Z35, 350Z Service Manual 50940109 – PDF DOWNLOAD

General Cautions for Maintenance Work
1-1 Correct Work
Correct work means the quickest possible completion of according to the correct procedures and the specified standards.
It is important when conducting certain operations always to bear in mind the equipment, tools, gauges, materials, oil
and grease, etc. that you must have ready, as well as items to be checked, adjusted, or disassembled, and cautions
to watch out for.
1-2 Safety Precautions
(1) Never attempt servicing while engine is running or immediately after stopping operation.
(2) Wear work cloths, safety shoes and helmet.
(3) Check the equipment and tools before use. Especially, be sure to check the crane, lifting equipment and tools.
(4) When working together with other persons, allocate everyone’s share of job, arrange the signals and act in concert
with the other persons.
(5) The operation of the crane and slinging work must be performed by qualified persons.
(6) Do not enter or pass under the raised load.
(7) Lift and support the massive parts by crane before removing the installation bolts.
(8) Disconnect cables from battery before repairing the electric system.
(9) Remove the battery when welding the machine.
1-3 Preparations
(1) Check the service record of the machine. (That is, check how many months or hours the machine has been
used since the preceding overhaul, what was the trouble then and what parts were replaced.)
(2) Have all servicing tools ready, i.e., tools, measuring devices (which have received periodic maintenance), containers,
oil & grease, etc.
(3) Have the service literature (operation manual, parts catalog, etc.) ready.

TABLE OF CONTENTS:

Gehl Compact Excavator Z27, 270Z, Z35, 350Z Service Manual 50940109 – PDF DOWNLOAD

CHAPTER 1
General Cautions for Maintenance Work
1-1 Correct Work …………………………………………………………………………………………………………………………………………………….. 1-1
1-2 Safety Precautions …………………………………………………………………………………………………………………………………………….. 1-1
1-3 Preparations……………………………………………………………………………………………………………………………………………………… 1-1
1-4 Cautions for Disassembly and Reassembly…………………………………………………………………………………………………………… 1-1
1-5 Cautions for Removal and Installation of Hydraulic Equipment ………………………………………………………………………………… 1-2
1-6 Cautions for Removal and Installation of Hydraulic Piping……………………………………………………………………………………….. 1-2
1-7 Cautions for Handling Seals………………………………………………………………………………………………………………………………… 1-3
1-8 Correct Installation of Hydraulic Hose …………………………………………………………………………………………………………………… 1-3
1-9 Specifications of Hydraulic Hose………………………………………………………………………………………………………………………….. 1-6
1-10 Air Release of Hydraulic Equipment………………………………………………………………………………………………………………….. 1-11
CHAPTER 2
Technical Data
2-1 Specifications …………………………………………………………………………………………………………………………………………………. 2-1-1
2-2 Outline Drawing and Working Area ……………………………………………………………………………………………………………………. 2-2-1
2-2-1 Canopy type …………………………………………………………………………………………………………………………………………… 2-2-1
2-2-2 Cabin type ……………………………………………………………………………………………………………………………………………… 2-2-2
2-3 Weight List of Main Parts …………………………………………………………………………………………………………………………………. 2-3-1
2-4 Lifting Capacity List …………………………………………………………………………………………………………………………………………. 2-4-1
CHAPTER 3
Service Standards
3-1 Machine Performance ……………………………………………………………………………………………………………………………………… 3-1-1
3-2 Engine …………………………………………………………………………………………………………………………………………………………… 3-2-1
3-3 Undercarriage…………………………………………………………………………………………………………………………………………………. 3-3-1
3-3-1 Rubber Crawler Specifications ………………………………………………………………………………………………………………….. 3-3-1
3-3-2 Steel Crawler Specifications……………………………………………………………………………………………………………………… 3-3-2
3-3-3 Common Specifications of Steel & Rubber Crawlers ……………………………………………………………………………………. 3-3-3
3-4 Controls …………………………………………………………………………………………………………………………………………………………. 3-4-1
3-5 Hydraulic Equipment ……………………………………………………………………………………………………………………………………….. 3-5-1
3-5-1 Hydraulic Cylinders …………………………………………………………………………………………………………………………………. 3-5-1
3-6 Implement………………………………………………………………………………………………………………………………………………………. 3-6-1
3-6-1 Front Attachments …………………………………………………………………………………………………………………………………… 3-6-1
3-6-2 Blade Moving Device……………………………………………………………………………………………………………………………….. 3-6-2
3-6-3 Bucket Teeth ………………………………………………………………………………………………………………………………………….. 3-6-2
3-7 List of Tightening Torque………………………………………………………………………………………………………………………………….. 3-7-1
3-7-1 Machine…………………………………………………………………………………………………………………………………………………. 3-7-1
3-7-2 Engine …………………………………………………………………………………………………………………………………………………… 3-7-4
3-7-3 Tightening Torque for General Bolts and Nuts…………………………………………………………………………………………….. 3-7-5
3-7-4 Hydraulic Fitting………………………………………………………………………………………………………………………………………. 3-7-6
CHAPTER 4
Engine
4-1 General………………………………………………………………………………………………………………………………………………………….. 4-1-1
4-1-1 How to Read This Manual ………………………………………………………………………………………………………………………… 4-1-1
4-1-2 Precautions for Service Work……………………………………………………………………………………………………………………. 4-1-3
4-1-3 Engine External Views ……………………………………………………………………………………………………………………………. 4-1-4
4-1-4 Structural Description ……………………………………………………………………………………………………………………………… 4-1-4
4-1-5 Exhaust Gas Emission Regulation …………………………………………………………………………………………………………….. 4-1-5
4-2 Troubleshooting………………………………………………………………………………………………………………………………………………. 4-2-1
4-2-1 Quick Reference Table for Troubleshooting………………………………………………………………………………………………… 4-2-1
4-2-2 Troubleshooting by Measuring Compression Pressure ………………………………………………………………………………… 4-2-4
4-3 Inspection and Adjustment……………………………………………………………………………………………………………………………….. 4-3-1
4-3-1 Oil Inspection………………………………………………………………………………………………………………………………………….. 4-3-1
4-3-2 Cooling Water Inspection …………………………………………………………………………………………………………………………. 4-3-1
4-3-3 Inspecting Water Leak from Cooling Water System and Radiator ………………………………………………………………….. 4-3-1
4-3-4 Fan Belt Tension Inspection and Adjustment………………………………………………………………………………………………. 4-3-2
4-3-5 Adjusting the Valve Clearance ………………………………………………………………………………………………………………….. 4-3-3
4-3-6 Inspecting the Fuel Injection Valve Injection Pressure and Spray Pattern……………………………………………………….. 4-3-5
4-3-7 Fuel Injection Timing Adjustment / Fuel Injection Pump Inspection and Adjustment …………………………………………. 4-3-9
4-3-8 Sensor Inspection………………………………………………………………………………………………………………………………….. 4-3-12
4-3-9 Battery Inspection………………………………………………………………………………………………………………………………….. 4-3-13
4-3-10 Adjusting Operation……………………………………………………………………………………………………………………………… 4-3-15
4-3-11 Long Storage………………………………………………………………………………………………………………………………………. 4-3-16
4-3-12 Periodic Maintenance Schedule…………………………………………………………………………………………………………….. 4-3-17
4-4 Engine Body…………………………………………………………………………………………………………………………………………………… 4-4-1
4-4-1 Introduction…………………………………………………………………………………………………………………………………………….. 4-4-1
4-4-2 Cylinder Head…………………………………………………………………………………………………………………………………………. 4-4-2
4-4-3 Gear Train and Camshaft……………………………………………………………………………………………………………………….. 4-4-11
4-4-4 Cylinder Block ………………………………………………………………………………………………………………………………………. 4-4-16
4-5 Lubrication System………………………………………………………………………………………………………………………………………….. 4-5-1
4-5-1 Lubrication System Diagram …………………………………………………………………………………………………………………….. 4-5-1
4-5-2 Trochoid Pump (Z27 / 270Z: 3TNV82A-SBV) ……………………………………………………………………………………………… 4-5-1
4-5-3 Trochoid pump (Z35 / 350Z: 3TNV88-BQBV) ……………………………………………………………………………………………… 4-5-3
4-6 Cooling System ………………………………………………………………………………………………………………………………………………. 4-6-1
4-6-1 Cooling Water System……………………………………………………………………………………………………………………………… 4-6-1
4-6-2 Cooling Water Pump Components…………………………………………………………………………………………………………….. 4-6-1
4-6-3 Disassembly (Reverse the Procedure Below for Assembly) ………………………………………………………………………….. 4-6-2
4-6-4 Servicing Points………………………………………………………………………………………………………………………………………. 4-6-2
4-7 Fuel Injection Pump / Governor…………………………………………………………………………………………………………………………. 4-7-1
4-7-1 Introduction…………………………………………………………………………………………………………………………………………….. 4-7-1
4-7-2 Fuel Injection Pump…………………………………………………………………………………………………………………………………. 4-7-1
4-8 Electrical Equipment………………………………………………………………………………………………………………………………………… 4-8-1
4-8-1 Starter Motor ………………………………………………………………………………………………………………………………………….. 4-8-1
4-8-2 Alternator……………………………………………………………………………………………………………………………………………….. 4-8-3
CHAPTER 5
Hydraulic System
5-1 Outline …………………………………………………………………………………………………………………………………………………………… 5-1-1
5-1-1 Control Valve Operation …………………………………………………………………………………………………………………………… 5-1-4
5-1-2 Additional Operation of Control Valve ………………………………………………………………………………………………………… 5-1-6
5-2 Hydraulic Circuit Schematic ……………………………………………………………………………………………………………………………… 5-2-1
5-3 Circuit Operation …………………………………………………………………………………………………………………………………………….. 5-3-1
5-3-1 Boom …………………………………………………………………………………………………………………………………………………….. 5-3-1
5-3-2 Arm……………………………………………………………………………………………………………………………………………………….. 5-3-3
5-3-3 Bucket …………………………………………………………………………………………………………………………………………………… 5-3-5
5-3-4 Swing…………………………………………………………………………………………………………………………………………………….. 5-3-7
5-3-5 Boom Swing …………………………………………………………………………………………………………………………………………… 5-3-9
5-3-6 Blade …………………………………………………………………………………………………………………………………………………… 5-3-11
5-3-7 Travel ………………………………………………………………………………………………………………………………………………….. 5-3-13
5-3-8 Non-Deviation Travel (with Boom, Arm or Boom Swing Operation)………………………………………………………………. 5-3-15
5-3-9 Non-Deviation Travel (with Bucket Operation) …………………………………………………………………………………………… 5-3-17
5-3-10 Simultaneous Operation of Boom Up and Arm Retract……………………………………………………………………………… 5-3-19
5-3-11 Simultaneous Operation of Boom Up and Bucket…………………………………………………………………………………….. 5-3-21
5-3-12 Simultaneous Operation of Boom Up and Swing ……………………………………………………………………………………… 5-3-23
5-3-13 Simultaneous Operation of Arm and Bucket ……………………………………………………………………………………………. 5-3-25
5-3-14 Hydraulic P.T.O. ………………………………………………………………………………………………………………………………….. 5-3-27
5-3-15 Quick Coupler……………………………………………………………………………………………………………………………………… 5-3-29
5-4 Pressure Adjustment……………………………………………………………………………………………………………………………………….. 5-4-1
5-4-1 Relief Valves ………………………………………………………………………………………………………………………………………….. 5-4-1
5-4-2 Swing Brake Valve ………………………………………………………………………………………………………………………………….. 5-4-3
5-4-3 Cut-Off Valve………………………………………………………………………………………………………………………………………….. 5-4-4
CHAPTER 6
Hydraulic Equipment
6-1 Hydraulic Pump………………………………………………………………………………………………………………………………………………. 6-1-1
6-1-1 Z27 / 270Z ……………………………………………………………………………………………………………………………………………… 6-1-1
6-1-2 Z35 / 350Z ……………………………………………………………………………………………………………………………………………. 6-1-23
6-2 Control Valve………………………………………………………………………………………………………………………………………………….. 6-2-1
6-3 Pilot Valve ……………………………………………………………………………………………………………………………………………………… 6-3-1
6-4 Swing Motor …………………………………………………………………………………………………………………………………………………… 6-4-1
6-5 Travel Motor ………………………………………………………………………………………………………………………………………………….. 6-5-1
6-5-1 Z27 / 270Z ……………………………………………………………………………………………………………………………………………… 6-5-1
6-5-2 Z35 / 350Z ……………………………………………………………………………………………………………………………………………. 6-5-43
6-6 Blade Control Pilot Valve………………………………………………………………………………………………………………………………….. 6-6-1
6-7 Solenoid Valve for P.T.O. Operation ………………………………………………………………………………………………………………….. 6-7-1
6-8 Pilot Check Valve (For Quick Coupler Circuit) …………………………………………………………………………………………………….. 6-8-1
CHAPTER 7
Adjustment and Repair
7-1 Electric Equipment of Machine………………………………………………………………………………………………………………………….. 7-1-1
7-1-1 Parts Layout of Electrical Equipment …………………………………………………………………………………………………………. 7-1-1
7-1-2 Monitor and Alarm Systems ……………………………………………………………………………………………………………………… 7-1-4
7-1-3 Wiring Diagram……………………………………………………………………………………………………………………………………….. 7-1-7
7-1-4 Circuit Description of Engine Start and Stop, and Battery Charging ……………………………………………………………… 7-1-10
7-1-5 Removal and Reinstallation of Engine ……………………………………………………………………………………………………… 7-1-12
7-1-6 Removal and Reassembly of Starter Motor ………………………………………………………………………………………………. 7-1-21
7-2 Undercarriage…………………………………………………………………………………………………………………………………………………. 7-2-1
7-2-1 Outline …………………………………………………………………………………………………………………………………………………… 7-2-1
7-2-2 Main Parts ……………………………………………………………………………………………………………………………………………… 7-2-1
7-2-3 Points of Reassembly (Rubber Track) ……………………………………………………………………………………………………….. 7-2-2
7-2-4 Points of Reassembly (Steel Track) …………………………………………………………………………………………………………… 7-2-3
7-2-5 Removal and Reinstallation of Crawler ………………………………………………………………………………………………………. 7-2-5
7-2-6 Removal and Reinstallation of Travel Motor ……………………………………………………………………………………………….. 7-2-7
7-2-7 Disassembly and Reassembly of Idler ……………………………………………………………………………………………………….. 7-2-9
7-2-8 Disassembly and Reassembly of Track Roller…………………………………………………………………………………………… 7-2-12
7-2-9 Disassembly and Reassembly of Carrier Roller…………………………………………………………………………………………. 7-2-15
7-2-10 Installation of Floating Seal …………………………………………………………………………………………………………………… 7-2-17
7-2-11 Drawings of Jigs ………………………………………………………………………………………………………………………………….. 7-2-18
7-3 Controls …………………………………………………………………………………………………………………………………………………………. 7-3-1
7-3-1 Control Train…………………………………………………………………………………………………………………………………………… 7-3-1
7-3-2 Mechanical Control Linkage ……………………………………………………………………………………………………………………… 7-3-2
7-3-3 Adjustment of Travel Levers……………………………………………………………………………………………………………………… 7-3-4
7-3-4 Adjustment of Boom Swing Pedal ……………………………………………………………………………………………………………… 7-3-5
7-3-5 Adjustment of Lock Lever…………………………………………………………………………………………………………………………. 7-3-6
7-3-6 Adjustment Procedure of Travel Alarm Switch…………………………………………………………………………………………….. 7-3-7
7-3-7 Adjustment Procedure of P.T.O. Pedal ………………………………………………………………………………………………………. 7-3-8
7-3-8 Adjustment Procedure of P.T.O. Pedal Lock……………………………………………………………………………………………….. 7-3-8
7-3-9 Adjustment of Accelerator Lever ……………………………………………………………………………………………………………….. 7-3-9
7-4 Swing Bearing ………………………………………………………………………………………………………………………………………………… 7-4-1
7-5 Hydraulic Equipment ……………………………………………………………………………………………………………………………………….. 7-5-1
7-5-1 Removal and Reinstallation of Hydraulic Pump …………………………………………………………………………………………… 7-5-1
7-5-2 Removal and Reinstallation of Control Valve ………………………………………………………………………………………………. 7-5-4
7-5-3 Removal and Reinstallation of Swing Motor………………………………………………………………………………………………… 7-5-9
7-5-4 Removal and Reinstallation of Swivel Joint……………………………………………………………………………………………….. 7-5-12
7-5-5 Disassembly and Reassembly of Swivel Joint …………………………………………………………………………………………… 7-5-16
7-5-6 Disassembly and Reassembly of Hydraulic Cylinders ………………………………………………………………………………… 7-5-19
7-5-7 Hydraulic Oil Tank …………………………………………………………………………………………………………………………………. 7-5-23
7-5-8 Piping Layout………………………………………………………………………………………………………………………………………… 7-5-29
7-6 Work Implements ……………………………………………………………………………………………………………………………………………. 7-6-1
7-6-1 Removal and Reinstallation of Work Implements…………………………………………………………………………………………. 7-6-1
7-6-2 Quick Coupler……………………………………………………………………………………………………………………………………….. 7-6-10
7-7 Cabin…………………………………………………………………………………………………………………………………………………………….. 7-7-1
7-7-1 Cabin …………………………………………………………………………………………………………………………………………………….. 7-7-1
CHAPTER 8
Periodic Inspection and Servicing
8-1 List of Periodic Inspection and Servicing……………………………………………………………………………………………………………….. 8-1
CHAPTER 9
Fuel, Lube Oil and Grease Recommended
9. Fuel, Lube Oil and Grease Recommended……………………………………………………………………………………………………………… 9-1
CHAPTER 10
Troubleshooting
10-1 Non-Breakdowns…………………………………………………………………………………………………………………………………………. 10-1-1
10-1-1 Natural Release of Bucket…………………………………………………………………………………………………………………….. 10-1-1
10-1-2 Discontinuous Arm Movement ………………………………………………………………………………………………………………. 10-1-1
10-1-3 Drifting of Upperstructure on Quick Travel Operation ……………………………………………………………………………….. 10-1-2
10-1-4 Thermal Shock of Travel Motor ……………………………………………………………………………………………………………… 10-1-3
10-1-5 Elongation of Boom Swing Cylinder on 75 degrees Swing ………………………………………………………………………… 10-1-4
10-1-6 Telescopic Motion of Boom Swing Cylinder with Lock Lever Set to Lock Position ………………………………………… 10-1-5
10-1-7 Time Lag on Travel Speed Switching……………………………………………………………………………………………………… 10-1-6
10-1-8 Fluctuation in Oil Level of Hydraulic Oil Tank Due to Temperature Change…………………………………………………. 10-1-7
10-1-9 Operation of Quick Coupler Cylinder (for Quick Coupler Type) ………………………………………………………………….. 10-1-8
10-2 Troubleshooting…………………………………………………………………………………………………………………………………………… 10-2-1
10-2-1 Machine and Engine…………………………………………………………………………………………………………………………….. 10-2-1
10-2-2 Electrical Equipment on Panel …………………………………………………………………………………………………………….. 10-2-23
CHAPTER 11
Reference Data
11-1 Dimensions and Specifications for Attachment …………………………………………………………………………………………………… 11-1

More products