Starting from:

$33

Gehl R134 Parts Manual 50111946B – PDF DOWNLOAD

Gehl R134 Parts Manual 50111946B – PDF DOWNLOAD

FILE DETAILS:

Gehl R134 Parts Manual 50111946B – PDF DOWNLOAD

Language : English
Pages : 128
Downloadable : Yes
File Type : PDF
Size: 30.5 MB

IMAGES PREVIEW OF THE MANUAL:

  

TABLE OF CONTENTS:

Gehl R134 Parts Manual 50111946B – PDF DOWNLOAD

GENERAL & SAFETY
DECALS 1
BRANDING DECALS 4
SERVICE PARTS
SERVICE PARTS -1340R/R134 6
FLUIDS -1340R/R134 8
10-ENGINE
ENGINE ASSEMBLY 10
ENGINE INSTALLATION & CONTROLS
ENGINE INSTALLATION & CONTROLS 12
FUEL SYSTEM
ENGINE ACCESSORY 16
AIR INDUCTION & EXHAUST SYSTEM
INTAKE & EXHAUST SYSTEM 18
COOLING SYSTEM
RADIATOR COOLER ASSEMBLY 20
ENGINE ELECTRICALS
ALTERNATOR-1340R/R134 22
STARTER MOTOR -1340R/R134 24
20-TRANSMISSION
ASSEMBLY WHEEL DRIVE 26
WHEELS 28
40-BRAKE
SOLENOID VALVE – BRAKE (PN 170-34994) 30
50-LIFT STRUCTURE
MAIN LOADER COMPONENTS
LIFT ARM 32
ALL-TACH ASSEMBLY 34
BUCKET ASSEMBLY – 11.6 CU.FT 36
BUCKET ASSEMBLY WITH BOLT-ON CUTTING EDGE 38
70-HYDRAULICS
CHASSIS HYDRAULIC 40
MAIN CONTROL VALVE 44
LIFT ARM HYDRAULICS 46
LIFT CYLINDER 49
TILT CYLINDER 51
SOLENOID VALVE -LIFT/TILT 53
STANDARD HYDRAULIC 55
HYDRAULIC CONTROLS
T-BAR CONTROL 57
AUXILIARY HYDRAULICS
AUXILIARY HYDRAULICS 62
HYDROSTATIC SYSTEM
TANDEM PUMP -GEAR PUMP END 64
TANDEM PUMP-ENGINE END 66
HYDROSTATIC DRIVE MOTORS 69
DRIVE MOTOR & PARKING BRAKE 71
HYDROSTATIC CONTROLS
HYDROSTATIC T-BAR CONTROL 73
80-ELECTRICAL
CHASSIS ELECTRICAL 75
ELECTRICAL DISCONNECT 78
ELECTRICAL LIGHTS ASSY 80
ROPS ELECTRICAL ASSEMBLY 83
85-OPERATOR STATION
ROPS ASSY 85
OPERATOR SEAT 89
RESTRAINT BAR 91
90-CHASSIS
CHASSIS ASSEMBLY 93
CHASSIS FENDER ASSEMBLY 97
SHIPPING GROUP 99
110-ADDITIONAL EQUIPMENT
BUCKET 10.6 Cu.Ft./ LIGHT MATERIAL 101
SELF-LEVEL VALVE HYDRAULICS 103
SELF-LEVELING VALVE (PN 135367) 105
SLIDING SIDE WINDOWS 107
TYRE ASSY 10X16.5(10 PR) 109
HORN KIT 111
ALARM BACKUP ASSY – T-BAR 113
CHASSIS FENDER ASSY 115
CAB DOOR WITH WIPER & WASHER KIT 117
CAB DOOR ASSEMBLY 121