Starting from:

$45

LEEBOY 8616B Conveyor Paver Operations, Service & Parts Manual SN 101158 PDF DOWNLOAD

LEEBOY 8616B Conveyor Paver Operations, Service & Parts Manual SN 101158 PDF DOWNLOAD

FILE DETAILS:

LEEBOY 8616B Conveyor Paver Operations, Service & Parts Manual SN 101158 PDF DOWNLOAD

Language : English
Pages : 287
Downloadable :Yes
File Type : PDF

IMAGES PREVIEW OF THE MANUAL:

  

DESCRIPTION:

LEEBOY 8616B Conveyor Paver Operations, Service & Parts Manual SN 101158 PDF DOWNLOAD

INTRODUCTION:

  • READ THIS MANUAL PRIOR TO OPERATING the paver. This manual is an important part of the paver and should be kept with the paver at all times in the dedicated storage container on the paver.
  • Even though you may be familiar with similar equipment, you MUST read and understand this manual before operating this paver.
  • Reading the manual will help you and others avoid injury and help prevent any damage to the paver. If this manual becomes lost or damaged, contact your authorized LeeBoy Dealer immediately to order a replacement (see Contact Information in Section 2).
  • This manual is intended as a guide for the safe and efficient use of the paver. This manual covers the procedures for proper operation and maintenance of the paver.
  • This manual contains information that was available at the time of printing and are subject to change without notice.
  • This manual should be used with all related supplemental books, engine and transmission manuals, and parts books. Related service bulletins should be reviewed to provide information regarding some of the recent changes.
  • If any questions arise concerning this publication or others, contact your local LeeBoy Dealer for the latest available information.

TABLE OF CONTENTS:

LEEBOY 8616B Conveyor Paver Operations, Service & Parts Manual SN 101158 PDF DOWNLOAD

Manual No. 1013539-01
This manual applies to machines beginning with Serial Number 101158

Safety......................................................... 13
	Safety Precautions......................................... 16
		Safety Decals.......................................... 20
Safety Decals Care............................................. 21
Decal Installation (Sticker Type).............................. 21
Decal Installation (Top Protected) ............................ 21
	Machine Precautions........................................ 22
Hot Material Precautions....................................... 22
Hydraulic Systems Precautions.................................. 22
Refueling Precautions.......................................... 22
Battery Precautions............................................ 22
Starting and Stopping Precautions.............................. 23
Parking Precautions............................................ 23
Operating Precautions.......................................... 23
Storage Precautions............................................ 24
Maintenance Precautions........................................ 24
	Information and Specifications............................. 25
		Limited Warranty Policy................................ 26
		Contact Information.................................... 27
		Specifications......................................... 28
		Torque Specifications.................................. 34
Standard Inch Fasteners........................................ 34
Metric Fasteners............................................... 35
Hydraulic Fittings............................................. 35
Determining Proper Torque...................................... 36
	Component Location......................................... 41
		Components Overview.................................... 42
Hydraulic System............................................... 42
Torque Hubs.................................................... 42
Hopper......................................................... 42
Augers......................................................... 42
Operator Platform.............................................. 42
Screed......................................................... 42
Electrical System.............................................. 43
	Machine Overview........................................... 44
		Steering and Speed Control Box......................... 45
		Operator Control Panel................................. 46
		Screed Control Boxes................................... 48
Electric Screed Operation Controls ............................ 49
	Steering Wheel (Option).................................... 50
	Operation.................................................. 52
		General Information.................................... 54
		Receiving the Machine.................................. 54
Initial and Daily Inspection................................... 54
	Start-Up Procedure......................................... 55
DP700 PLUS+1® Display Unit..................................... 55
Start-Up Screen................................................ 55
Engine Screen.................................................. 56
Paver Screen................................................... 56
Time Adjust.................................................... 57
Fault Screens.................................................. 57
DPF Regeneration (REGEN)....................................... 58
Status Icons................................................... 59
	Driving the Paver.......................................... 61
Operator Control Station....................................... 61
Steering and Speed Control..................................... 61
	Paver Operation............................................ 62
Spray Down..................................................... 62
Set the Screed and Endgates.................................... 63
Hopper Wings................................................... 65
Conveyor....................................................... 65
Hydraulic Cut-Off Gates ....................................... 66
Sonic Auger ................................................... 66
Tow Point Cylinders............................................ 67
	Starting to Pave........................................... 67
Basic Paving................................................... 68
Setting the Crown.............................................. 69
Mat Texture Adjustment......................................... 70
	Unloading And Loading...................................... 71
Unloading...................................................... 71
Loading........................................................ 71
Tie-Down Procedure............................................. 72
	Optional Components........................................ 72
Auger Extensions Option........................................ 72
Power Crown Option............................................. 73
Umbrella Option................................................ 73
Truck Hitch Attachment Option.................................. 73
	Maintenance Schedule....................................... 76
		Lubrication Points..................................... 77
Torque Hub Lubrication......................................... 78
	Routine Maintenance........................................ 79
Preparing Machine for Maintenance.............................. 79
Every 10 Hours or Daily Routine Maintenance ................... 79
Every 50 Hours or Weekly Routine Maintenance................... 79
Every 100 Hour or Monthly Maintenance.......................... 79
Every 250 Hours or Quarterly Routine Maintenance............... 80
Every 500 Hours or Semi-Annual Routine Maintenance............. 80
Every 1000 Hours or Annual Routine Maintenance................. 80
	Maintenance Adjustments.................................... 80
Conveyor Flight Chain.......................................... 80
Conveyor Drive Chain........................................... 81
Conveyor Paddle Adjustment..................................... 81
Auger Drive Chain Adjustment................................... 82
Screed Extension Top Guide Adjustment.......................... 82
Track Tension.................................................. 83
High Gear Adjustment........................................... 84
	Electrical System.......................................... 84
Battery Servicing.............................................. 85
Alternator..................................................... 85
Generator Voltage Testing...................................... 86
Generator Capacitor Replacement................................ 87
Screed Electric Heat Elements.................................. 87
Element Relays................................................. 88
Element Resistance Testing..................................... 89
Heating Elements............................................... 89
	Engine Maintenance......................................... 90
Check Engine Lubrication Oil................................... 90
Change Engine Oil and Filter................................... 90
	Fuel System................................................ 91
Fuel Tank...................................................... 91
Change Air Filter.............................................. 91
Change Fuel Filter............................................. 92
	Hydraulic System........................................... 92
Check Hydraulic Oil............................................ 92
Change Hydraulic Oil and Filter................................ 93
Change Hydraulic Oil Strainer.................................. 94
	Replacement Procedures..................................... 94
2-Speed Motor Replacement...................................... 94
Drive Torque Hub Replacement................................... 95
Track Sprocket Replacement..................................... 95
Front Idler and Bushing........................................ 96
Rear Conveyor Shaft, Bearings and Sprockets ................... 96
Conveyor Wear Plates........................................... 97
Conveyor Drive Motors.......................................... 98
Cut-Off Assembly............................................... 98
Auger And Inner Bearing........................................ 98
Replacing Auger Motors......................................... 99
Rear Hopper Wing Cylinders.....................................100
Front Hopper Wing Cylinders....................................100
Pumps and Hood.................................................101
Screed Extension Wear Plates...................................101
	Weldment...................................................102
		Troubleshooting Chart..................................103
		DP700 Diagnostic Trouble Code (DTC) Chart..............106
	Schematics.................................................  1
		Screed Control Box Assembly, Left Side.................  1
		Screed Control Box Assembly, Right Side................  1
		Operator Control Panel Assembly .......................  1
		Harness, Jumper, 31 Pin Dash to Pedestal...............  1
		Harness, Jumper, 47 Pin Dash to Pedestal...............  1
		Harness, Main Manifold.................................  1
		Harness, Front Manifold................................  1
		Harness, Hydraulic Oil Cooler..........................  1
		Main Harness Electrical Overview.......................  1
		Main Harness Electrical (1 of 6).......................  1
		Main Harness Electrical (2 of 6).......................  1
		Main Harness Electrical (3 of 6).......................  1
		Main Harness Electrical (4 of 6).......................  1
		Main Harness Elelctrical (5 of 6)......................  1
		Main Harness Electrical (6 of 6).......................  1
		Main Harnass Layout....................................  1
		Hydraulic Schematic Overview - Version A...............  1
		Hydraulic Schematic Layout - Version A (1 of 3) .......  1
		Hydraulic Schematic Layout - Version A (2 of 3) .......  1
		Hydraulic Schematic Layout - Version A (3 of 3) .......  1
		Hydraulic Schematic Overview - Version B...............  1
		Hydraulic Schematic Layout - Version B (1 of 3)........  1
		Hydraulic Schematic Layout - Version B (2 of 3)........  1
		Hydraulic Schematic Layout - Version B (3 of 3) .......  1
		Electric Heat Control (Standard).......................  1
		Electric Heat Control with 110 Outlet (Option).........  1
		Electric Heat Endgates (Option)........................  1
	Illustrated Parts List.....................................  1
		Quick Reference .......................................  1
		Track Assembly - Poly Pads.............................  1
		Track Assembly - Tension and Propel....................  1
		Conveyor Assembly......................................  1
		Pushbar Assembly.......................................  1
		Drive Conveyor.........................................  1
		Engine Assembly with Pumps.............................  1
		Engine Components  (1 of 2) ...........................  1
		Engine Components  (2 of 2)............................  1
		Tanks .................................................  1
		Hydraulic Components  .................................  1
		Secondary Valve........................................  1
		Generator  ............................................  1
		Hopper Wings...........................................  1
		Hoods and Covers.......................................  1
		Engine Cover Assembly..................................  1
		Spray Down.............................................  1
		Dash Assembly..........................................  1
		Dash Control Box   ....................................  1
		Rear Auger Assembly  (1 of 1)..........................  1
		Rear Auger Assembly  (2 of 2)..........................  1
		Screed Frame Assembly - Electric  .....................  1
		Walk Board Assembly....................................  1
		Screed Vibrator Assembly  .............................  1
		Screed Slide Plate  ...................................  1
		Screed Extension (Left) Assembly  .....................  1
		Screed Extension (Right) Assembly  ....................  1
		Screed Endgate (Left) Assembly  .......................  1
		Screed Endgate (Right) Assembly  ......................  1
		Screed Heated Endgate Option (Right)...................  1
		Screed Heated Endgate Option (Left) ...................  1
		Screed Heated Edge Endgate Option (Right)..............  1
		Screed Heated Edge Endgate Option (Left)...............  1
		Screed Pull Arm (Left) Assembly........................  1
		Screed Pull Arm (Right) Assembly.......................  1
		Screed Thickness Adjuster Assembly ....................  1
		Electric Heat Control Assembly (Standard)..............  1
		Screed Heat Control Box w/Heated Endgates (Option) ....  1
		Screed Heat Control Box, 110 VAC (Option)..............  1
		Screed Optional Components.............................  1
		Paver Leveling Ski, 20 Feet (Option)...................  1
		Paver Leveling Ski, 30 - 40 Feet (Option)..............  1
		TOPCON P-32 Control Kit (Option).......................  1
		Truck Hitch Assembly (Option)..........................  1
		Alphabetical Parts Index...............................  1
Safety......................................................... 13
	Safety Precautions......................................... 16
	Safety Decals.............................................. 20
		Safety Decals Care..................................... 21
		Decal Installation (Sticker Type)...................... 21
		Decal Installation (Top Protected) .................... 21
	Machine Precautions........................................ 22
		Hot Material Precautions............................... 22
		Hydraulic Systems Precautions.......................... 22
		Refueling Precautions.................................. 22
		Battery Precautions.................................... 22
		Starting and Stopping Precautions...................... 23
		Parking Precautions.................................... 23
		Operating Precautions.................................. 23
		Storage Precautions.................................... 24
		Maintenance Precautions................................ 24
Information and Specifications................................. 25
	Limited Warranty Policy.................................... 26
	Contact Information........................................ 27
	Specifications............................................. 28
	Torque Specifications...................................... 34
		Standard Inch Fasteners................................ 34
		Metric Fasteners....................................... 35
		Hydraulic Fittings..................................... 35
		Determining Proper Torque.............................. 36
Component Location............................................. 41
	Components Overview........................................ 43
		Hydraulic System....................................... 43
		Torque Hubs............................................ 43
		Hopper................................................. 43
		Augers................................................. 43
		Operator Platform...................................... 43
		Screed................................................. 43
		Electrical System...................................... 44
	Machine Overview........................................... 45
	Steering and Speed Control Box............................. 46
	Operator Control Panel..................................... 47
	Screed Control Boxes....................................... 49
		Electric Screed Operation Controls .................... 50
	Steering Wheel (Option).................................... 51
Operation...................................................... 52
	General Information........................................ 54
	Receiving the Machine...................................... 54
		Initial and Daily Inspection........................... 54
	Start-Up Procedure......................................... 55
		DP700 PLUS+1® Display Unit............................. 55
		Start-Up Screen........................................ 55
		Engine Screen.......................................... 56
		Paver Screen........................................... 56
		Time Adjust............................................ 57
		Fault Screens.......................................... 57
		DPF Regeneration (REGEN)............................... 58
		Status Icons........................................... 59
	Driving the Paver.......................................... 61
		Operator Control Station............................... 61
		Steering and Speed Control............................. 61
	Paver Operation............................................ 62
		Spray Down............................................. 62
		Set the Screed and Endgates............................ 63
		Hopper Wings........................................... 65
		Conveyor............................................... 65
		Hydraulic Cut-Off Gates ............................... 66
		Sonic Auger ........................................... 66
		Tow Point Cylinders.................................... 67
	Starting to Pave........................................... 67
		Basic Paving........................................... 68
		Setting the Crown...................................... 69
		Mat Texture Adjustment................................. 70
	Unloading And Loading...................................... 71
		Unloading.............................................. 71
		Loading................................................ 71
		Tie-Down Procedure..................................... 72
	Optional Components........................................ 72
		Auger Extensions Option................................ 72
		Power Crown Option..................................... 73
		Umbrella Option........................................ 73
		Truck Hitch Attachment Option.......................... 73
Maintenance Schedule........................................... 76
	Lubrication Points......................................... 77
		Torque Hub Lubrication................................. 78
	Routine Maintenance........................................ 79
		Preparing Machine for Maintenance...................... 79
		Every 10 Hours or Daily Routine Maintenance ........... 79
		Every 50 Hours or Weekly Routine Maintenance........... 79
		Every 100 Hour or Monthly Maintenance.................. 79
		Every 250 Hours or Quarterly Routine Maintenance....... 80
		Every 500 Hours or Semi-Annual Routine Maintenance..... 80
		Every 1000 Hours or Annual Routine Maintenance......... 80
	Maintenance Adjustments.................................... 80
		Conveyor Flight Chain.................................. 80
		Conveyor Drive Chain................................... 81
		Conveyor Paddle Adjustment............................. 81
		Auger Drive Chain Adjustment........................... 82
		Screed Extension Top Guide Adjustment.................. 82
		Track Tension.......................................... 83
		High Gear Adjustment................................... 84
	Electrical System.......................................... 84
		Battery Servicing...................................... 85
		Alternator............................................. 85
		Generator Voltage Testing.............................. 86
		Generator Capacitor Replacement........................ 87
		Screed Electric Heat Elements.......................... 87
		Element Relays......................................... 88
		Element Resistance Testing............................. 89
		Heating Elements....................................... 89
	Engine Maintenance......................................... 90
		Check Engine Lubrication Oil........................... 90
		Change Engine Oil and Filter........................... 90
	Fuel System................................................ 91
		Fuel Tank.............................................. 91
		Change Fuel Filter..................................... 92
	Hydraulic System........................................... 92
		Check Hydraulic Oil.................................... 92
		Change Hydraulic Oil and Filter........................ 93
		Change Hydraulic Oil Strainer.......................... 94
	Replacement Procedures..................................... 94
		2-Speed Motor Replacement.............................. 94
		Drive Torque Hub Replacement........................... 95
		Track Sprocket Replacement............................. 95
		Front Idler and Bushing................................ 96
		Rear Conveyor Shaft, Bearings and Sprockets ........... 96
		Conveyor Wear Plates................................... 97
		Conveyor Drive Motors.................................. 98
		Cut-Off Assembly....................................... 98
		Auger And Inner Bearing................................ 98
		Replacing Auger Motors................................. 99
		Rear Hopper Wing Cylinders.............................100
		Front Hopper Wing Cylinders............................100
		Pumps and Hood.........................................101
		Screed Extension Wear Plates...........................101
	Weldment...................................................102
	Troubleshooting Chart......................................103
	DP700 Diagnostic Trouble Code (DTC) Chart..................106
8616B Paver 6-7.pdf............................................  0
	Schematics.................................................116
		Screed Control Box Assembly, Left Side.................118
		Screed Control Box Assembly, Right Side................120
		Operator Control Panel Assembly .......................122
		Harness, Jumper, 31 Pin Dash to Pedestal...............124
		Harness, Jumper, 47 Pin Dash to Pedestal...............126
		Harness, Main Manifold.................................128
		Harness, Front Manifold................................130
		Harness, Hydraulic Oil Cooler..........................132
		Main Harness Electrical Overview.......................134
		Main Harness Electrical (1 of 6).......................136
		Main Harness Electrical (2 of 6).......................138
		Main Harness Electrical (3 of 6).......................140
		Main Harness Electrical (4 of 6).......................142
		Main Harness Elelctrical (5 of 6)......................144
		Main Harness Electrical (6 of 6).......................146
		Main Harnass Layout....................................148
		Hydraulic Schematic Overview - Version A...............150
		Hydraulic Schematic Layout - Version A (1 of 3) .......152
		Hydraulic Schematic Layout - Version A (2 of 3) .......154
		Hydraulic Schematic Layout - Version A (3 of 3) .......156
		Hydraulic Schematic Overview - Version B...............158
		Hydraulic Schematic Layout - Version B (1 of 3)........160
		Hydraulic Schematic Layout - Version B (2 of 3)........162
		Hydraulic Schematic Layout - Version B (3 of 3) .......164
		Electric Heat Control (Standard).......................166
		Electric Heat Control with 110 Outlet (Option).........168
		Electric Heat Endgates (Option)........................170
	Illustrated Parts List.....................................172
		Quick Reference .......................................174
		Track Assembly - Poly Pads.............................175
		Track Assembly - Tension and Propel....................177
		Conveyor Assembly......................................179
		Pushbar Assembly.......................................181
		Drive Conveyor.........................................183
		Engine Assembly with Pumps.............................185
		Engine Components  (1 of 2) ...........................187
		Engine Components  (2 of 2)............................189
		Tanks .................................................191
		Hydraulic Components  .................................193
		Secondary Valve........................................195
		Generator  ............................................197
		Hopper Wings...........................................199
		Hoods and Covers.......................................201
		Engine Cover Assembly..................................203
		Spray Down.............................................205
		Dash Assembly..........................................207
		Dash Control Box   ....................................209
		Rear Auger Assembly  (1 of 1)..........................211
		Rear Auger Assembly  (2 of 2)..........................213
		Screed Frame Assembly - Electric  .....................215
		Walk Board Assembly....................................217
		Screed Vibrator Assembly  .............................219
		Screed Slide Plate  ...................................221
		Screed Extension (Left) Assembly  .....................223
		Screed Extension (Right) Assembly  ....................225
		Screed Endgate (Left) Assembly  .......................227
		Screed Endgate (Right) Assembly  ......................229
		Screed Heated Endgate Option (Right)...................231
		Screed Heated Endgate Option (Left) ...................233
		Screed Heated Edge Endgate Option (Right)..............235
		Screed Heated Edge Endgate Option (Left)...............237
		Screed Pull Arm (Left) Assembly........................239
		Screed Pull Arm (Right) Assembly.......................241
		Screed Thickness Adjuster Assembly ....................243
		Electric Heat Control Assembly (Standard)..............245
		Screed Heat Control Box w/Heated Endgates (Option) ....247
		Screed Heat Control Box, 110 VAC (Option)..............249
		Screed Optional Components.............................251
		Paver Leveling Ski, 20 Feet (Option)...................253
		Paver Leveling Ski, 30 - 40 Feet (Option)..............255
		TOPCON P-32 Control Kit (Option).......................257
		Truck Hitch Assembly (Option)..........................259
		Alphabetical Parts Index...............................261

More products