Starting from:

$40

Komatsu D155AX-3 Bulldozer Operation & Maintenance Manual PDF DOWNLOAD

Komatsu D155AX-3 Bulldozer Operation & Maintenance Manual

Description:

Komatsu D155AX-3 Bulldozer Operation & Maintenance Manual

  • Since the work equipment of this machine is heavy, the hydraulic pressure of the machine is used to install it efficiently. Accordingly, the engine is started to operate the hydraulic cylinders.
  • You are required to execute full inspection and maintenance before starting the engine and assembling the work equipment. Since the work is often carried out in dangerous places and positions by a team, hold a safety meeting in advance and appoint a crane director, work leader, etc. so that all the members can work safely.
  • When the work is carried out in an overseas country, difference in language, customs, etc. lowers safety. Accordingly, the field liaison man and work supervisor must examine the above points and take necessary measures.

Table Of Contents:

Komatsu D155AX-3 Bulldozer Operation & Maintenance Manual

MAIN MENU......................................................... 0
COVER............................................................. 1
CONTENTS.......................................................... 3
PRECAUTIONS FOR FIELD ASSEMBLY.................................... 4
TIGHTENING TORQUE................................................. 5
A. ASSEMBLY.......................................................10
	A-1 Installation of operator’s cab............................11
		1. Installation of open lock stopper......................11
		2. Installation of cab mounting L-plate...................11
		3. Installation of seal to air conditioner box............13
		4. Installation of seals to operator’s cab mating face....13
		5. Installation of operator’s cab.........................15
		6. Installation of interior parts.........................22
		7. Change of antenna mounting angle.......................26
	A-2 Installation of additional working lamps..................27
M. TESTING AND ADJUSTING AFTER INSTALLATION.......................30
	M-1 Testing and adjusting operator’s cab......................31
		1. Testing painting.......................................31
		2. Pressurizing test......................................31
		3. Shower test............................................32
		4. Testing door lock......................................33
		5. Testing open lock......................................35

Image Preview:

  

More products