Starting from:

$29

Sakai Asphalt Roller GW754 Operation & Maintenance Manual – PDF

Sakai Asphalt Roller GW754 Operation & Maintenance Manual – PDF DOWNLOAD

The Sakai Asphalt Roller GW754 Operation & Maintenance Manual provides comprehensive guidance for operating and maintaining the GW754 roller. This downloadable PDF offers essential information for efficient operation and upkeep of the equipment.

FILE DETAILS:

Sakai Asphalt Roller GW754 Operation & Maintenance Manual – PDF DOWNLOAD

Language : English
Pages : 122
Downloadable : Yes
File Type : PDF

IMAGES PREVIEW OF THE MANUAL:

 

DESCRIPTION:

Sakai Asphalt Roller GW754 Operation & Maintenance Manual – PDF DOWNLOAD

  • This operator’s manual serves as a guide for the use of your SAKAI GW754 Vibrating Roller for those who are new to the machine, and also for the people who have experience in using the machine and want to refresh their knowledge for the machine.
  • Read this manual thoroughly and try to fully understand the information before operating your machine. Keep this handbook at hand whenever you do your work. When an instruction manual is lost or is damaged and is not legible, replace it immediately.
  • The main subjects of this manual are:
    (1) Basic precautions for safety, (2) Operation, (3) Daily maintenance and (4) Specifications.For operation and maintenance of the engine, refer to the Engine Instruction Manual furnished separately. Descriptions in this manual can differ from the machine instructions of your machine due to the results of the investigation and improvement in its design. If you have any inquiry regarding your machine or this manual, contact our distributors.

TABLE OF CONTENTS:

Sakai Asphalt Roller GW754 Operation & Maintenance Manual – PDF DOWNLOAD

PREFACE
MACHINE AND ENGINE IDENTIFICATION NUMBERS 1
SAFETY NOTICES 2
1 BASIC PRECAUTIONS FOR SAFETY 4
1.1 General Precautions 4
1 .2 Preparation for Safe Operation 8
1 .3 Before Starting the Engine 9
1 .4 After Starting the Engine 10
1.5 During Operation 11
1.6 Loading and Unloading 14
1 7 Transportation 14
1.8 Handling the Battery 15
1.9 Towing 16
1 .10 Before Servicing 17
1.11 During Servicing 19
1 12 Safety Decals 22
2 OPERATION 25
2.1 Instruments and Controls 25
2.1 .1 Operator’s station 25
2.1 .2 Gauges, indicator lamps and warning lamps 26
2.1.3 Switches 31
2.1 .4 Operating levers and pedals 37
2.1.5 Unloader valve 39
2.1.6 Fuse box 39
2.1.7 Fusible link 40
2.1.8 Accessory soket 40
2.2 Handling and Adjustments 41
2.2.1 Seat adjustment 41
2.2.2 Replacement of scraper 42
2.2.3 Disengaging the brake when towing 42
2.2.4 Operator’s platform position adjustment 43
2.2.5 Engine troubleshooting 43
2.3 Operation 44
2.3.1 Before-starting inspection 44
2.3.2 Starting the engine 45
2.3.3 After starting the engine 47
2.3.4 Traveling 48
2.3.5 Stopping / Parking 50
2.3.6 Stopping the engine 51
2.3.7 Check after stopping the engine 52
2.4 Vibratory Operation 52
2.5 Operating the After Treatment System 54
2.5.1 DPF 54
2.5.2 DEF SCR system 57
CONTENTS
2.6 Sprinkler/ Changeover Valve 60
2.7 Liquid Sprayer 64
2.8 Precautions for Work 66
2.8.1 Compaction operation 66
2.8.2 When going downhill 66
2.8.3 On a slope 66
2.9 Applicable Jobs 67
2.10 After Operation 68
2.11 Loading and Unloading 68
2.11 .1 Use of a truck or trailer equipped with a winch 69
2.11.2 Self-propelling 70
2.12 After Loading the Machine 70
2.13 Transportation 70
2.14 Operation in Cold Weather 71
2.14.1 Fuel oil and grease 71
2.14.2 Coolant 71
2.14.3 DEF 72
2.14.4 Battery 73
2.15 When the Cold Season is Over 74
2.16 For a Long Storage Period 74
2.17 During the Storage Period 75
2.18 When the Battery Has Discharged 76
2.18.1 Connection and disconnection of booster cables 76
3 PERIODICAL MAINTENANCE 78
3.1 Precautions 78
3.1.1 Lifting the machine on a hoist 81
3.2 Walk-Around Checking 82
3.3 Periodical Maintenance Points 84
3.4 Maintenance Procedure 86
(1) Every 10 hours or daily 86
(2) Every 50 hours 88
(3) Every 250 hours 90
(4) Every 500 hours 91
(5) Every 500 hours or 3 months,
or each time after brake pedal is used 95
(6) Every 1000 hours 96
(7) Every 1500 hours 97
(8) Every 3000 hours 97
(9) As required 98
3.5 Consumable Parts 104
3.5.1 Changing the DEF pump filter 106
3.5.2 Replacement of filter in DEF 107
3.6 Fluid and Lubricant Capacities 108
3.7 Electric Wiring Diagram 111
4 SPECIFICATIONS 114

More products