$22.95
The Sakai Soil Roller SV400-2 Series Operator Manual covers SV400D-2, SV400T-2, SV400TF-2, SV400TB-2, and SV400FB-2 models, offering essential guidance for safe operation. Convenient PDF download available.
FILE DETAILS:
Sakai Soil Roller SV400-2 Series SV400D-2 SV400T-2 SV400TF-2 SV400TB-2 SV400FB-2 Operator Manual – PDF DOWNLOAD
Language : English
Pages :77
Downloadable : Yes
File Type : PDF
DESCRIPTION
Sakai Soil Roller SV400-2 Series SV400D-2 SV400T-2 SV400TF-2 SV400TB-2 SV400FB-2 Operator Manual – PDF DOWNLOAD
PREFACE
TABLE OF CONTENTS:
Sakai Soil Roller SV400-2 Series SV400D-2 SV400T-2 SV400TF-2 SV400TB-2 SV400FB-2 Operator Manual – PDF DOWNLOAD
CONTENTS
PREFACE
MACHINE AND ENGINE IDENTIFICATION NUMBERS 1
SAFETY NOTICES 2
1 BASIC SAFETY PRECAUTIONS 4
11 General Precautions 4
12 Preparation for Safe Operation 6
13 Before Starting the Engine 7
14 After Starting the Engine 8
15 During Operation 8
16 Loading and Unloading 10
17 Transportation 1 1
18 Handling the Battery 1 1
19 Towing12
110 Before Servicing13
111 During Servicing14
112 Safety Decals16
2 OPERATION18
21 Instruments and Controls18
211 Operator’s station18
212 Gauges, indicator lamps and warning lamps19
213 Switches 2 1
214 Operating levers / pedals23
215 Unloader valve25
216 Fuse box25
22 Handling and Adjustments26
221 Seat adjustment26
222 Scraper adjustment and replacement27
223 Disengaging the brake when towing28
23 Operation29
231 Before-starting inspection29
232 Starting the engine30
233 After starting the engine31
234 Traveling32
235 Stopping / Parking33
236 Stopping the engine34
237 Check after stopping the engine34
24 Vibratory Operation35
25 Precautions for Work36
2 51 Compaction operation36
252 When going downhill36
253 On a slope36
26 Applicable Jobs37
27 After Operation38
28 Loading and Unloading39
281 Use of a trailer equipped with a winch39
282 Self-propelling40
2 9 After Loading the Machine41
210 Transportation41
21 1 Operation in Cold Weather41
21 11 Fuel oil and grease41
21 12 Coolant41
21 13 Battery42
212 When the Cold Season is Over43
213 For a Long Storage Period43
214 During the Storage Period43
215 When the Battery Has Discharged44
2151 Connection and disconnection of booster cables44
3 PERIODIC MAINTENANCE46
31 Precautions46
311 Lifting the machine on a hoist48
32 Walk-around Checking49
33 Periodic Maintenance Points50
34 Maintenance Procedure52
(1) Every 10 hours or daily52
(2) Every 50 hours53
(3) Every 250 hours55
(4) Every 500 hours57
(5) Every 1000 hours60
(6) As required62
35 Fluid and Lubricant Capacities64
36 Electric Wiring Diagram66
37 Fuse Box67
38 Battery67
4 SPECIFICATIONS68