$24.95
The Sakai SV410-2 Series Operation Manual is a PDF guide crucial for operation. It covers SV410-2 vibrating roller models, facilitating efficient usage and maintenance.
FILE DETAILS:
Sakai SV410-2 Series Vibrating Roller Operation Manual – PDF DOWNLOAD
Language : English
Pages : 77
Downloadable : Yes
File Type : PDF
IMAGES PREVIEW OF THE MANUAL:
TABLE OF CONTENTS:
Sakai SV410-2 Series Vibrating Roller Operation Manual – PDF DOWNLOAD
CONTENTS
PREFACE
MACHINE AND ENGINE IDENTIFICATION NUMBERS 1
SAFETY NOTICES 2
1 BASIC SAFETY PRECAUTIONS 4
11 General Precautions 4
12 Preparation for Safe Operation 6
13 Before Starting the Engine 7
14 After Starting the Engine 8
15 During Operation 8
16 Loading and Unloading 10
17 Transportation 1 1
18 Handling the Battery 1 1
19 Towing 12
110 Before Servicing 13
111 During Servicing 14
112 Safety Decals 16
2 OPERATION18
21 Instruments and Controls 18
211 Operator’s station 18
212 Gauges, indicator lamps and warning lamps 19
213 Switches 2 1
214 Operating levers / pedals 23
215 Unloader valve 25
216 Fuse box 25
22 Handling and Adjustments 26
221 Seat adjustment 26
222 Scraper adjustment and replacement 27
223 Disengaging the brake when towing 28
23 Operation 29
231 Before-starting inspection 29
232 Starting the engine 30
233 After starting the engine 31
234 Traveling 32
235 Stopping / Parking 33
236 Stopping the engine 34
237 Check after stopping the engine 34
24 Vibratory Operation 35
25 Precautions for Work 36
2 51 Compaction operation 36
252 When going downhill 36
253 On a slope 36
26 Applicable Jobs 37
27 After Operation 38
28 Loading and Unloading 39
281 Use of a trailer equipped with a winch 39
282 Self-propelling 40
2 9 After Loading the Machine 41
210 Transportation 41
21 1 Operation in Cold Weather41
21 11 Fuel oil and grease 41
21 12 Coolant 41
21 13 Battery 42
212 When the Cold Season is Over 43
213 For a Long Storage Period 43
214 During the Storage Period 43
215 When the Battery Has Discharged 44
2151 Connection and disconnection of booster cables 44
3 PERIODIC MAINTENANCE 46
31 Precautions 46
311 Lifting the machine on a hoist 48
32 Walk-around Checking 49
33 Periodic Maintenance Points 50
34 Maintenance Procedure 52
(1) Every 10 hours or daily 52
(2) Every 50 hours 53
(3) Every 250 hours 55
(4) Every 500 hours 57
(5) Every 1000 hours 60
(6) As required 62
35 Fluid and Lubricant Capacities 64
36 Electric Wiring Diagram 66
37 Fuse Box 67
38 Battery 67
4 SPECIFICATIONS 68