$30.95
SAKAI SW880-1, SW990-1 Vibrating Roller Operating & Maintenance Manual – PDF DOWNLOAD
The Sakai SW880-1 and SW990-1 Vibrating Roller Operating & Maintenance Manual is a comprehensive guide in PDF format detailing essential instructions for operating and maintaining these heavy-duty construction machines, aiding users in maximizing efficiency and longevity.
FILE DETAILS:
SAKAI SW880-1, SW990-1 Vibrating Roller Operating & Maintenance Manual – PDF DOWNLOAD
Language : English
Pages : 111
Downloadable : Yes
File Type : PDF
IMAGES PREVIEW OF THE MANUAL:
DESCRIPTION:
SAKAI SW880-1, SW990-1 Vibrating Roller Operating & Maintenance Manual – PDF DOWNLOAD
TABLE OF CONTENTS:
SAKAI SW880-1, SW990-1 Vibrating Roller Operating & Maintenance Manual – PDF DOWNLOAD
PREFACE
MACHINE AND ENGINE IDENTIFICATION NUMBERS 1
SAFETY NOTICES 2
1 BASIC PRECAUTIONS FOR SAFETY 4
1.1 General Precautions 4
1.2 Preparation for Safe Operation 8
1.3 Before Starting the Engine 9
1.4 After Starting the Engine 10
1.5 During Operation 11
1.6 Loading and Unloading 14
1.7 Transportation 14
1.8 Handling the Battery 15
1.9 Towing 16
1.10 Before Servicing 17
1.11 During Servicing 19
1.12 Safety Decals 22
2 OPERATION 24
2.1 Instruments and Controls 24
2.1.1 Operator’s station 24
2.1.2 Gauges, indicator lamps and warning lamps 25
2.1.3 Switches 29
2.1.4 Operating levers / pedals 37
2.1.5 Fuse box and Line fuse 39
2.2 Handling and Adjustments 39
2.2.1 Seat adjustment 39
2.2.2 Scraper adjustment and replacement 40
2.2.3 Disengaging the brake when towing 41
2.2.4 Steering wheel position adjustment 42
2.2.5 Operator’s platform position adjustment 43
2.2.6 Step for maintenance of engine room 43
2.2.7 Engine diagnoses 44
2.3 Operation 45
2.3.1 Before-starting inspection 45
2.3.2 Starting the engine 46
2.3.3 After starting the engine 47
2.3.4 Traveling 48
2.3.5 Stopping and parking 51
2.3.6 AUTO SPEED 52
2.3.6.1 Setting 52
2.3.6.2 Canceling AUTO SPEED 53
2.3.7 Stopping the engine 54
2.3.8 Check after stopping the engine 54
2.4 Vibratory Operation 55
2.5 Water Spray System 57
CONTENTS
2.6 EXACT COMPACT Operation (Impact Space Indicator & Speed Mater) 60
2 6.1 Function 60
2 6.2 Operating instruction 60
2 6.3 Operation 62
2.7 Machine Controller Diagnoses 62
2.8 Precautions for Work 64
2 8.1 Compaction operation 64
2.8.2 When going downhill 64
2.8.3 On a slope 64
2.9 Applicable Jobs 64
2.10 After Operation 65
2.11 Loading and Unloading 66
2.11.1 Use of a trailer equipped with a winch 66
2.11.2 Self-propelling 67
2.12 After Loading the Machine 67
2.13 Transportation 68
2.14 Operation in Cold Weather 68
2.14.1 Fuel oil and grease 68
2.14.2 Coolant 68
2.14.3 Battery 70
2.15 When the Cold Season is Over 71
2.16 For a Long Storage Period 71
2.17 During the Storage Period 71
2.18 When the Battery has Discharged 72
2.18.1 Connection and disconnection of booster cables 72
3 PERIODIC MAINTENANCE 74
3.1 Precautions 74
3.1.1 Lifting the machine on a hoist 76
3.2 Walk-around Checking 77
3.3 Periodic Maintenance Points 78
3.4 Maintenance Procedure 80
(1) Every 10 service hours or daily 80
(2) Every 50 service hours 82
(3) Every 250 service hours 83
(4) Every 500 service hours 85
(5) Every 1000 service hours 87
(6) As needed 93
3.5 Consumable Parts 96
3.6 Fluid and Lubricant Capacities 98
3.7 Electric Wiring Diagram 100
3.8 Fuse Box and Line Fuse 102
3.9 Battery 102
4 SPECIFICATIONS 103