$32
Tadano AR-1600M All Terrain Crane Operation Manual – PDF DOWNLOAD
FILE DETAILS:
Tadano AR-1600M All Terrain Crane Operation Manual – PDF DOWNLOAD
Language : English
Pages : 265
Downloadable : Yes
File Type : PDF
IMAGES PREVIEW OF THE MANUAL:
TABLE OF CONTENTS:
Tadano AR-1600M All Terrain Crane Operation Manual – PDF DOWNLOAD
Safety A-1
Safety Rules A-2
Before Operation A-2
Rules for Operation (Setting Outriggers) A-7
Rules for Operation (General) A-8
Rules for Operation (Weather) A-18
Rules for Operation (Power Lines, Radio Waves)
Rules for Operation (Special Operation) A-21
After Operation A-22
Rules for Road Travel A-22
Rules for Inspection and Maintenance A-23
Preface 4
Servicing and Ordering Parts 5
Components 6
Layout of Controls 7
Terminology 10
[OPERATION]
Crane Operation Procedure – Summary 13
Preparatory Steps 13
During Operation 14
At the End of Operation 14
How to Read Performance Data Plate 15
Load Radius-Lifting Height Chart 15
Rated Lifting Capacity Table 16
AML (Overload Prevention Device) 20
Configuration and Functions of the AML System 21
Controls 22
Messages and Recovering Operations 23
In the Event of a System Failure 25
How to Use the Multi-display 26
Names and Functions of the Keys 26
Turning On and Off the Power Supply 27
Before Crane Operations 28
Brightness of the Display and its Adjustment 29
Choosing a Screen Display 30
Pre-operational Inspection 31
Registering Operating Condition 32
Setting a Standard Display 35
Limiting a Working Range 37
Confirming the Working Range 38
Confirming Pump, Wind speed and Accumulator
Pressures 39
Camera Monitor Display (Option) 40
Displaying Rated Lifting Capacities 41
Calculating the Load of Outriggers 43
Clock Adjustment 46
Confirming How to Use the Multi-display 46
Other Safety Devices 47
Overwind Cutout Device 47
Low Accumulator Pressure Alarm Device 48
Air Pressure Warning 48
AML External Indicator Lamp 49
Outriggers 50
Setting the Outriggers 50
Controls 51
Outrigger Extension Width 52
Preparations for Outrigger Operations 52
How to Use the Accelerator Switch 53
Extending the Outriggers 53
Level Adjustment 56
Extending the Rear Jack 57
Stowing the Outriggers 57
Outrigger Operations for Traveling a Small Distance 59
Crane Operator’s Cab 60
Before Entering and Exiting the Crane Operator’s
Cab 60
Opening and Closing the Door 60
Opening and Closing the Window 61
Adjusting the Seat 61
Adjusting the Lever Stand 62
Canceling the Lever Lock 62
Tilting the Crane Operator’s Cab 63
Starting and Stopping the Engine 64
Controls 64
Inspection before Starting the Engine 66
Starting the Engine 66
Stopping the Engine 67
Warming Up the Machine 68
Warning Up the Machine 68
Acceleration 69
Controls 69
Hoisting 70
Controls 70
Hoisting 72
How to Use Other Controls 73
AR-1600M-1/01-3E
Telescoping the Boom 76
Controls 76
Telescoping the Boom 79
Locking the 2nd Boom Section 81
Boom Length Adjustment 82
Emergency Boom Telescoping Operation 83
Extending/Retracting the 3rd/4th/Top Boom
Sections 83
Elevating the Boom 84
Controls 84
Elevating the Boom 85
How to Use Other Controls 86
Swinging the Boom 88
Controls 88
Swinging the Boom 90
How to Use Other Controls 91
Taking Out and Stowing the 65-ton Hook Block 93
Taking Out the 65-ton Hook Block 93
Stowing the 65-ton Hook Block 94
Reeving Wire Ropes 96
Standard Number of Parts of Line 96
Reeving Procedure 101
Single Top 102
Components 102
Single Top Lift 102
Mounting the Single Top 103
Stowing the Single Top 105
Full Automatic Luffing Jib 107
Components 107
Operation through the Remote Control Unit B 108
Full Automatic Luffing Jib Lift 109
Mounting/dismounting the Full Automatic Luffing Jib
Luffing Jib 119
Components 119
Jib Length and Tension Rope Combination 120
Pre-operational Inspection (before Luffing Jib Lift) 121
Operation through the Remote Control Unit B 123
Luffing Jib Lift 124
Mounting the Luffing Jib 128
Dismounting the Luffing Jib 139
Mounting and Dismounting Counterweights 146
Components 146
Combination of Counterweights 146
Remote Control Unit A 147
Mounting/Dismounting the Counterweights 148
Mounting and Dismounting the Crane 154
Components 155
Mounting the Superstructure 156
Mounting the Boom Assembly 161
Dismounting the Boom Assembly 165
Dismounting the Superstructure 169
Equipment Inside the Cab 173
Air Conditioner 174
Radio 178
How to Use Other Equipment 181
[INSPECTION AND MAINTENANCE]
Inspection and Maintenance 183
Pre-operational and Periodic Inspection 184
Greasing 187
Maintenance Table 187
Greasing Chart 188
Full Automatic Luffing Jib 189
Gear Oil 190
Maintenance Table 190
Winch Speed Reducer Oil Replacement 190
Swing Speed Reducer Oil Replacement 191
Full Automatic Luffing Jib Mounting/Dismounting
Winch Speed Reducer Oil Replacement 192
Luffing Jib Elevation Wire Rope Reeving Winch
Speed Reducer Oil Replacement 192
Engine 193
Maintenance Table 193
Air Cleaner Check 193
Element Cleaning 193
Element Replacement 194
Engine Cooling System 195
Maintenance Table 195
Cooling Water Level Check 195
Fuel System 196
Maintenance Table 196
Fuel Tank Level Check 196
Hydraulic System 197
Maintenance Table 197
Oil Level Check (Hydraulic Oil Tank) 198
Oil Replacement (Hydraulic Oil Tank) 198
Return Filter (Hydraulic Oil Tank) 199
Air Breather (Hydraulic Oil Tank) 199
Line Filter (Automatic Stop Circuit) 199
Swing System 200
Maintenance Table 200
Swing Bearing Mounting Bolt Check 200
Contents 2 Contents
T008122E
Electrical System 201
Maintenance Table 201
Fuse Replacement 201
Battery Electrolyte Check 202
Air Conditioning System 203
Maintenance Table 203
Air Filter Cleaning 203
Condenser Fin Clogging Check 203
Compressor Drive Belt Tension Check 204
Filling Amount of Cooling Agent Gas 204
Periodic Part Replacement 204
Wire Ropes 205
Proper Handling of Wire Ropes 205
Wire Rope Replacement 206
[INFORMATION AND DATA]
Hand Signals 211
Specifications 214
Crane Specifications 214
Overall Dimensions 215
Relief Valve Pressure 216
Wire Rope Specifications 216
Mass of the Hook Block 216
Other 216
Oils and Greases 217
Table 217
Recommended Oils and Greases 218
Consumable Parts 220
Filters 220
Fuses 220
AR-1600M Weight Distribution Chart 221