$38
FILE DETAILS:
Terex Crane RT75 Operation & Maintenance Manual 49622 – PDF DOWNLOAD
Language : English
Pages : 290
Downloadable : Yes
File Type : PDF
IMAGES PREVIEW OF THE MANUAL:
TABLE OF CONTENTS:
Terex Crane RT75 Operation & Maintenance Manual 49622 – PDF DOWNLOAD
49622 capitolo_00_EN_RT75_rev 03 1
capitolo_01_EN_RT75_edizione 04-2012 7
capitolo_02_EN_RT75_edizione 12-2011 15
capitolo_03_EN_edizione 04-2012 27
III 27
Advice on safety when using mobile cranes 29
INTRODUCTION 29
OPERATOR’S RESPONSIBILITIES 30
SIGNALLER’S RESPONSIBILITY 30
RESPONSIBILITIES OF ALL RELEVANT PERSONNEL 32
Management’s responsibilities 32
PLANNING THE WORKSITE 33
SAFETY CHECK BY OPERATOR 34
OPERATION PRECAUTIONS 35
General instructions 42
General 43
Access and cleaning 44
Machine operation 45
Maintenance 47
Electrical circuit 48
Hydraulic circuit 49
Tyres 50
Replacing the tyres 50
Instructions for reading the load table 51
Choosing the best configuration 52
Reduction of operating loads 55
Extension secured to brackets 56
Mounted extension 56
Special instructions for lifting on tyres 57
Special instructions for lifting on outriggers 58
Special instructions for lifting with mechanical element extended 59
Max forces exerted on ground (daN) 60
Actions of the wind 61
Safety devices 62
Load and movement limiter 62
Limit stop device 63
In compliance with the safety regulations, the crane truck is equipped with: 63
1 Lifting limit stop device that blocks the manoeuvre, preventing the block from getting too close to the boom head 63
2 A “three dead turns” lowering limit stop device that prevents complete unwinding of the rope from the winch drum 63
Deadman Safety Device 68
Machine operation 68
Engine starting 69
1 Make sure the gearshift lever is in the neutral position “N” 69
2 Select the fast or slow gears according to needs (where applicable) 69
3 Turn the ignition key 69
4 The battery level, braking system air circuit, engine oil pressure and coolant temperature warning lights on the instrument panel come on 69
5 Beep the horn 69
6 The parking brake must be applied 69
7 Turn the ignition switch to the second position to start the engine 69
Switching off the engine 69
Securing the block (hook) to the truck crane 70
Driving on road 72
Driving on the worksite 73
Machine stabilization 74
Support surfaces 75
Extension of the boom 78
Lifting rope 79
Eccentric rigging (unbalanced) 82
Symmetrical rigging (balanced) 83
Changing the number of tackles 84
Blocks and hooks 85
Harnessing the load 86
Extensions assembly – disassembly 86
Work with main winch and auxiliary winch 87
Lifting with several mobile cranes 90
Towing 91
Transporting the crane on a self-propelled trailer 92
capitolo_04_EN_RT75_edizione 12-2011a 93
RCL RT75 EN ed 12-2011a 127
4 1 Layout of the RT75 system 132
4 2 System Functions 133
5 1 View Pages 136
5 1 1 Operative Pages 137
5 1 2 Configuration Pages 137
6 1 INIT Page 138
6 2 SETUP Page 139
6 2 1 Work Settings: Machine Setup & Operating Mode 140
6 2 2 Outriggers/Tyres 141
6 2 3 Counterweight 142
6 2 4 Block Assembly 142
6 2 5 Main Boom/Jib 143
6 2 6 Jib Storage 144
6 2 7 Tackle 144
6 3 LMI Page 145
6 4 ENGINE Page 148
6 5 ISAAC Pages 150
6 5 1 ISAAC1 Page 150
6 5 2 ISAAC 2 Page 152
6 6 ISAAC Function 154
6 6 1 Setting Boom Movement Limits (ISAAC1 Page) 154
6 6 2 Setting Turret Slewing Limits (ISAAC2 Page) 155
7 1 1 Display Page 158
7 1 2 Date&Time Page 159
7 1 3 Unit of Measurement Page 160
7 1 4 Language Page 161
7 1 5 Joystick Page 162
7 1 6 Joystick Page 163
8 1 Alarms 166
8 2 List of Alarms 166
9 1 Warning 169
9 2 List of Warnings 169
capitolo_05_EN_RT75_edizione 08-2012 171
capitolo_06_EN_edizione 07-2012 217
VI 217
capitolo_07_EN_edizione 04-2011 283