$38
FILE DETAILS:
Terex Demag Crawler Crane CC1500 250 Ton Mouting Manual – PDF DOWNLOAD
Language : English
Pages : 495
Downloadable : Yes
File Type : PDF
IMAGES PREVIEW OF THE MANUAL:
TABLE OF CONTENTS:
Terex Demag Crawler Crane CC1500 250 Ton Mouting Manual – PDF DOWNLOAD
Foreword
Contents
Safety lnstructions
General
Transporting the Crawler-mounted Сгапе
General
Transporting the Main Components
Transporting the Boom System
AssemЫing and Dismantling the Сгапе
General
Bolt Connections
Hydraulic Cylinders – Protection of the Piston Rods
AssemЫy lnstructions
AssemЫing the Crane –
Self-AssemЫy with the A-frame
General
AssemЫing the Chassis Outriggers
General
AssemЫy Procedure with Auxiliary Crane
AssemЫy Sequence without the Auxiliary Crane
Swinging the Crane Operator’s СаЬ into Operating Position and
Tilting
General
Swinging the Crane Operator’s СаЬ into the Operating Position
Tilting the Crane Operator’s СаЬ
Raising the А- Frame and Placing the А- Frame in the AssemЫy
Position
AssemЫing the Central Ballast оп the Chassis
General
AssemЫy Procedure (with an Auxiliary Crane)
AssemЫing the Track Frames
General
Self-assemЫy of the first track frame:
Self-assemЫy of the second track frame:
AssemЫing the Left-hand Track Frame
General
AssemЫy Procedure for the Left-hand Track Frame
AssemЫing the Right-hand Track Frame
General
AssemЫy Procedure for the Right-hand Track Frame
Connecting the Hydraulic Lines
AssemЫing the Counterweight
General
Mounting Sequence
AssemЫy of the Auxiliary Support оп the Chassis
(Optional Equipment)
General
AssemЫy procedure
Dismantling the Сгапе
General
Dismantling the Auxiliary Support оп the Chassis
General
Dismantling Procedure
Dismantling the Counterweight
Dismantling the Track Frame
General
Dismantling the first track frame:
Dismantling the second track frame:
Dismantling the Hydraulic Lines
Supporting the Сгапе оп Outriggers
Dismantling the Right-hand Track Frame
General
Dismantling Procedure
Dismantling the Left-hand Track Frame
General
Dismantling
Dismantling the Central Ballast оп the Chassis
Folding the A-Frame into the Transport Position
General
Tilting and Swinging the СаЬ into the Transport Position
General
Tilting the Сгапе Operator’s СаЬ
Swinging the Сгапе Operator’s СаЬ into the Transport Position
Dismantling the Chassis Outriggers
General
Dismantling Procedure with the Auxiliary Сгапе
Dismantling Procedure without the Auxiliary Сгапе
AssemЫing the Main Boom
General
AssemЫing and Fitting the Main Boom SH
AssemЫing Main Boom Comblnations SH
Fitting Main Boom Comblnation SH
AssemЫing the Main Boom Stay Вагs with the Comblnation SH
Fitting the Runner оп the Connecting Head
General
AssemЫy Sequence
Dismantling the Runner
AssemЫing the Auxiliary Bracing (Bracing Chains) fог the
Comblnation SH
AssemЫing the Auxiliary Bracing (Bracing Chains) fог the
Comblnation SH – Boom lengths 72 m
AssemЫing the Auxiliary Bracing (Bracing Chains) fог the
Comblnation SH – Boom lengths 78 m – 84 m
AssemЫing and Fitting the Main Boom SH / LH 53
AssemЫing the Main Boom Comblnations SH / LH 55
Fitting the Main Boom Comblnations SH / LH 93
AssemЫing the Main Boom Stay Bars with the Comblnation SH 103
Fitting the Runner оп the Тор Piece HI 105
General 105
AssemЫy Sequence 107
Dismantling the Runner 111
AssemЫing the Auxiliary Bracing (Bracing Chains) for the
Comblnation SH / LH 113
AssemЫing the Auxiliary Bracing (Bracing Chains) with the
Comblnation SH/LH –
Boom length 66 m 11 3
AssemЫing the Auxiliary Bracing (Bracing Chains) with the
Comblnation SH/LH –
Boom lengths 72 m – 84 m 115
AssemЫing of the Auxiliary Bracing (Bracing Chains) with the
Comblnation SH/LH –
Boom lengths 90 m – 96 m 117
AssemЫing of the Auxiliary Bracing (Bracing Chains) with the
Comblnation SH/LH –
Boom lengths 102 m 119
AssemЫing the Main Boom and Fly Jib 3
General 3
AssemЫing and Fitting Fly Jib Comblnation SW 5
AssemЫing Main Boom Comblnation SH for Variant SW 7
AssemЫing Fly Jib Comblnations for Variant SW 43
Fitting Main Boom and Fly Jib SW 63
AssemЫing the stay bars НА and the stay bars HI for the
comblnation SW 91
AssemЫing the Auxiliary Bracing (Bracing Chains) for the
Comblnation SW – Boom lengths 60 m – 72 m 93
Fitting the Runner 95
Dismantling the Runner 103
9 Reeving the Ropes З
9 1 General 3
9 2 Reeving the Derricking Ropes 5
9 3 Reeving the Luffing Rope 7
9 4 Reeving the Hoist Ropes 9
9 4 1 Reeving the Hoist Ropes – Comblnation SH 9
9 4 2 Reeving the Hoist Ropes – Comblnation SH / LH 19
9 4 3 Reeving the Hoist Ropes – Comblnation SW 29
Erecting and Lowering the Boom System
General
Erecting Boom Variant SH
General
Erecting Boom Variant SH, without Runner
Erecting Boom Variant SH, with Runner
Erecting the Boom Variant SH / LH, Heavy Basic Length (SGL) of
the Main Boom VariaЫe
General
Erecting the Boom Variant SH / LH, Heavy Basic Length (SGL) of
the Main Boom VariaЫe, without Runner
Erecting the Boom Variant SH / LH (SGL vario), without Runner,
with an Auxiliary Crane
Erecting the Boom Variant SH / LH, Heavy Basic Length (SGL) of
the Main Boom vario, with Runner
Erecting the Boom Variant SH / LH (SGL vario), with Runner,
with an Auxiliary Crane
Erecting Boom Variant SW
General
Erecting Boom Variant SW, without Roller Set оп the Main Boom
Erecting boom variant SW, without roller set оп the main boom,
without runner
Erecting Boom Variant SW, without Roller Set оп the Main Boom,
without Runner, with Auxiliary Crane
Erecting Boom Variant SW, without Roller Set оп the Main Boom,
with Runner
Erecting Boom Variant SW, without Roller Set оп the Main Boom,
with Runner, with an Auxiliary Crane
Erecting Boom Variant SW, with Roller Set оп the Main Boom
Erecting Boom Variant SW, with Roller Set оп the Main Boom,
without Runner
Erecting Boom Variant SW, with Roller Set оп the Main Boom,
without Runner, with an Auxiliary Crane
Erecting Boom Variant SW, with Roller Set оп the Main Boom,
with Runner
Erecting Boom Variant SW, with Roller Set оп the Main Boom,
with Runner, with an Auxiliary Crane
Hydraulic Power Pack with Pin Locking Cylinder
General
Starting the Hydraulic Power Pack
Actuation of the Pin Locking Cylinder
Setting down the Hydraulic Power Pack