Starting from:

$34

Wacker Neuson Light Towers LTN 6L 60Hz Operators Manual _0171883 – PDF DOWNLOAD

Wacker Neuson Light Towers LTN 6L 60Hz Operators Manual _0171883 – PDF DOWNLOAD

FILE DETAILS:

Wacker Neuson Light Towers LTN 6L 60Hz Operators Manual _0171883 – PDF DOWNLOAD

Language : English
Pages :102
Downloadable : Yes
File Type : PDF

TABLE OF CONTENTS:

Wacker Neuson Light Towers LTN 6L 60Hz Operators Manual _0171883 – PDF DOWNLOAD

Safety Information 9
11 Signal Words Used in this Manual 9
12 Machine Description and Intended Use 10
13 Safety Guidelines for Operating the Machine 11
14 Operator Safety while Using Internal Combustion Engines 13
15 Lamp Safety 14
16 Service Safety 14
2 Labels 16
21 Label Locations 16
22 Label Meanings 18
3 Operation 31
31 Locating Trailer 31
32 Leveling Trailer 32
33 Adjusting Lights 33
34 Preparing Trailer for Towing or Lifting 34
35 Raising Tower (Manual Winch System) 35
36 Lowering Tower (Manual Winch System) 38
37 Raising Tower (Power Winch System) 40
38 Lowering Tower (Power Winch System) 42
39 Emergency Crank Handle (Power Winch System) 43
310 Control Panels (Manual Winch System) 44
311 Control Panels (120/240, Manual Winch System) 45
312 Control Panels (Power Winch System) 46
313 Starting 47
314 Manual Shutdown 47
315 Automatic Shutdown 47
316 Operating Lights 48
317 Stopping 48
318 Derating 48
319 Receptacle 49
6 wc_bo0171883en_006TOCfm
Table of Contents LTN 6L
4 Schematics 50
41 Electrical Schematic 50
42 Electrical Schematic (120/240) 52
43 Trailer Wiring 54
44 Engine Wiring – Lombardini 55
45 Control Panel Wiring 56
46 Power Winch Schematic 57
5 Maintenance 58
51 Installing / Removing Light Fixtures 58
52 Replacing / Removing Lamps 59
53 Daily Inspection 60
54 Air Cleaner 61
55 Engine Oil 61
56 Periodic Maintenance Schedule 62
57 Troubleshooting 63
6 Technical Data 65
61 Engine 65
62 Generator 66
63 Machine 66
7 Appendix I—Assembly Instructions 67
71 Introduction 67
8 Appendix II—Assembly Safety 69
81 Signal Words Found in this Manual 69
82 Lifting Safety 70
83 Pre-Assembly Checklist 70
wc_bo0171883en_006TOCfm 7
LTN 6L Table of Contents
9 Appendix III—Standard Pallet Assembly 71
91 Installing the Outriggers and Outrigger Jacks 72
92 Installing the Rear Jack 74
93 Installing the Tongue Assembly 75
94 Conclusion 77
10 Appendix IV—CE Pallet Assembly 78
101 Installing the Side Jacks 79
102 Installing the Rear Jack 80
103 Conclusion 81
11 Appendix V—Standard Racked Assembly 82
111 Installing the Axle 84
112 Installing the Fenders 85
113 Installing the Wheels 86
114 Installing the Outriggers and Outrigger Jacks 87
115 Installing the Rear Jack 88
116 Installing the Tongue Assembly 89
117 Installing the Tower Lock Bracket 91
118 Installing the Tower Cradle 92
119 Installing the Tower 93
1110 Installing the Tower Pivot Cable 94
1111 Installing the Lights 95
1112 Connecting the Wiring at the Junction Box 96
1113 Routing the Coil Cord 98
1114 Wiring the Ballasts and Terminal Strips 99
1115 Conclusion 101

IMAGES PREVIEW OF THE MANUAL:

 

More products